
WHIRLPOOL ELECTRICAL APPLIANCES CO. LTD.
SERVICE MANUAL
Ref : 56258291a
PAGE 10 OF 17
7.
MAJOR COMPONENT TESTS
7.1
HV TRANSFORMER
1.
Remove lead wire.
2.
Measure the resistance of the winding using an ohm meter
3.
Primary winding
3 ohm (approx.)
4.
Secondary winding
100 ohm (approx.)
5.
Filament winding
0 ohm (approx.)
7.2
HV CAPACITOR
1.
Remove lead wire
2.
Measure the resistance using an ohm meter set to R*1000
3.
Terminal to terminal should momentary indicates several ohms but gradually
increases to infinite.
4.
Terminal to case should show infinite.
7.3
HV DIODE
1.
Remove lead wire.
2.
Measure forward resistance, normal diode show continuity.
3.
Measure reverse resistance, normal diode show infinite resistance.
7.4
MAGNETRON
1.
Remove lead wire.
2.
Install the magnetron gasket in the correct position. Check that the gasket is in
good condition.
3.
Measure the resistance of the filament terminals. Normal magnetron should
be less than 1 ohm.
4.
Measure the resistance between the filament terminal to chassis. Normal
magnetron should be infinite.
7.5
INTERLOCK SWITCH SYSTEM
IMPORTANT: The installation of the interlock and monitor switches is
required by Federal regulations.
Oven door
status
Primary switch
Secondary
switch
Monitor
switch
Open
Open
Open
Close
Close
Close
Close
Open