
Please call for replacement parts or assistance: 1-866-942-5362
Factory #11906
Page # 9
Assembly Instruction
5. Complete the second unit by installing remaining Long Double Rivet Beams
(part B). Make sure the Long Double Rivet Beams are flush with the Short Ones
after installing. As shown in detail #3. Hit the beams near the joints with a
rubber mallet to lock pieces together.
6. Lay the Shelf Decks (part D) in place. Add Post Caps (Part E) to tops of the
Angle Posts. As shown in detail# 4.