W
ESTFIELD
- G
RAIN
A
UGERS
3. A
SSEMBLY
W130 - 31’ & 36’ PTO-SD & EMD
30749 R0
25
Figure 3.13
5. Fasten upper lift arms to lower reach arms with 3/4" x 2" bolts and locknuts.
Do not over-tighten. Tighten snug only; these bolts act as pivot points.
6. Raise the discharge end of auger with a
front end loader and a strong sling/chain or
block and tackle. The height should be
sufficient to clear undercarriage assembly.
7. Position transport undercarriage beneath tube assembly and attach lower
reach arms to mounting bracket on bottom tube with 3/4" x 2" bolts and
locknuts sandwiching the stabilizer brackets between as shown in Figure
3.14. Do not over-tighten. Tighten snug only as these bolts act as pivot
points.
WARNING
Do not remove tube support until auger is fully
assembled.
Figure 3.15
Fi
3 14
Содержание W130-31
Страница 6: ...1 INTRODUCTION WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 6 30749 R0 ...
Страница 14: ...2 SAFETY WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 14 30749 R0 ...
Страница 30: ...3 ASSEMBLY WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 30 30749 R0 ...
Страница 34: ...4 TRANSPORT PLACEMENT WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 34 30749 R0 ...
Страница 40: ...5 OPERATION WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 40 30749 R0 ...
Страница 44: ...6 MAINTENANCE STORAGE WESTFIELD GRAIN AUGERS W130 31 36 PTO SD EMD 44 30749 R0 ...