W
ESTFIELD
- MKX100-S
ERIES
G
RAIN
A
UGERS
3. A
SSEMBLY
MKX100-53/63/73/83
30908 R3
21
3.2.2. I
NSTALL
H
YDRAULIC
L
IFT
C
YLINDERS
1. Identify the tube section where the hydraulic lift cylinders install, and rotate
the section so that the cylinder mount brackets are facing up.
2.
MKX100-83 Only:
Slide the cylinder ram guide (27486) onto the end of the
track closest to where the lift cylinder is installed. Ensure the triangular gusset
of ram guide are facing the discharge end.
3. Position the lift cylinder on the welded brackets on the lower end of auger
tube (see Figure 3.5 for correct position), and secure with four
7/16” x 1” bolts and locknuts.
Tighten securely
.
Note:
The hydraulic lift cylinder must be positioned with the rod end towards the
discharge end of auger.
4.
MKX100-83 Only:
Slide the cylinder ram guide (27486) toward the lift
cylinder until the rod end passes through the hole provided on the cylinder
ram guide, and then insert a 5/16" x 2-1/2" roll pin (28584) into the hole end of
the cylinder rod to prevent separation of rod and cylinder ram guide.
5. Rotate the auger tube section so that the lift cylinder is facing down, and
ensure that the tube is secure on its supports.
6. Strap the tube in place and proceed with connecting auger tube sections
together.
Figure 3.5 Installing Lift Cylinder (MKX100-53/63/73)
7/16” X 1” BOLTS [19542]
7/16” LOCKNUTS [19598]
Содержание MKX100 SERIES
Страница 2: ......
Страница 4: ...WESTFIELD MKX100 SERIES GRAIN AUGERS MKX100 53 63 73 83 4 30908 R3 ...
Страница 6: ...1 INTRODUCTION WESTFIELD MKX100 SERIES GRAIN AUGERS MKX100 53 63 73 83 6 30908 R3 ...
Страница 16: ...2 SAFETY WESTFIELD MKX100 SERIES GRAIN AUGERS MKX100 53 63 73 83 16 30908 R3 ...
Страница 62: ...3 ASSEMBLY WESTFIELD MKX100 SERIES GRAIN AUGERS MKX100 53 63 73 83 62 30908 R3 ...