Western Telematic WTI NBB-20VD16 Series Скачать руководство пользователя страница 14

4-2

Hardware Installation

4.3.  Connection to Switched Outlets

Connect the power cord from your switched device to one of the AC Outlets on the NBB 
unit.  Note that when power is applied to the NBB, the AC Outlets will be switched “ON” 
by default.  Note that some NBB models include two separate power branches, while 
others feature only one power branch.

4.3.1.  Installing the Optional Cable Retainer Bars

The NBB unit is available with two optional cable retainer bars, one for the Line A outlets 
and one for the Line B outlets.  To install the optional cable retainer bars, please refer to 
the instructions in Appendix D.

4.4.  Serial SetUp Port Connection

The NBB SetUp Port is a female, RJ45 RS232 connector, wired in a DCE configuration.  
In the default state, the Setup port is configured for 9600 bps, no parity, 8 data bits, 1 
stop bit.  The Setup Port can be connected to either an external modem or a local PC, 
but not both items at the same time.  Appendix B describes the Setup Port interface.

4.4.1.  Connecting a Local PC

Use the DX9F-WTI Adapter supplied with the unit to connect your PC COM port to the 
NBB Setup Port.  Make certain that the Serial Port Mode is set to “Normal” as described 
in the WTI Firmware Guide.

4.4.2.  Connecting an External Modem

When connecting directly to an external modem, use the optional DX9M-RJ-KIT (not 
included) to connect your external modem to the NBB Setup Port.  Make certain that the 
modem is initialized at the same default parameters as the NBB Setup Port and that the 
NBB Serial Port Mode is set to “Modem” as described in the WTI Firmware Guide.

4.5.  Connecting the Network Cable

The Network Port is an RJ45 Ethernet jack, for connection to a TCP/IP network.  
Connect your network cable to the Ethernet Port on the NBB unit.  Note that NBB 
units include a default IPv4 format IP address (192.168.168.168) and a default IPv4 
protocol subnet mask (255.255.255.0.)  When installing the NBB in a working network 
environment, it is recommended to define network parameters as described in the  
WTI Firmware Guide.

Note:

 The NBB features a 10/100/1000Base-T auto-negotiating Interface; 

speed and duplex mode will be automatically negotiated.  When connecting to 
an Ethernet interface, most router switches will autosense to determine if the 

device is 1000Base-T, 100Base-T or 10Base-T, and then configure the network 

interface accordingly.  If your router switch does not autosense, the NBB will 
auto negotiate speed and duplex mode.

Содержание WTI NBB-20VD16 Series

Страница 1: ...WTI Part No 14532 Rev A NBB Series NetworkPowerSwitches VerticalMount Products Covered NBB 20VS20 16 Series NBB 20VS30 32 Series NBB 20VD20 16 Series NBB 20VD30 32 Series Hardware Guide...

Страница 2: ...current protection and supply wiring Grounding Reliable earthing of this equipment must be maintained Particular attention should be given to supply connections when connecting to power strips rather...

Страница 3: ...p Starter Cable s If the NBB unit includes a detached 125 VAC 15 Amp Starter Cable s this allows you to connect the NBB to power for bench testing and initial start up is adequate for applications tha...

Страница 4: ...two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation WARNING Changes or mod...

Страница 5: ...4 1 4 2 2 Installing the Power Supply Cable Keepers 4 1 4 3 Connection to Switched Outlets 4 2 4 3 1 Installing the Optional Cable Retainer Bars 4 2 4 4 Serial SetUp Port Connection 4 2 4 4 1 Connecti...

Страница 6: ...ork equipment sites and off site facilities by providing secure remote access to power switching and reboot functions at the remote network equipment site Note For instructions regarding configuration...

Страница 7: ...Mounting Holes Two sets of screw holes for mounting the optional cable retainer bar for Power Circuit B as described in Appendix D 5 Line A Circuit Breakers Two circuit breakers which protect Line A O...

Страница 8: ...A O OFF ON 20A O OFF ON 20A O OFF ON 20A O NBB 20V ON OFF DEF RDY BRANCH A BRANCH B CURRENT USAGE BRANCH A 100 10 CURRENT USAGE BRANCH B 100 10 14 1 2 3 3 4 4 5 6 7 8 9 10 11 12 13 Figure 2 1 NBB Face...

Страница 9: ...ctions For power supply requirements for individual NBB units please refer to the product name plate Note that some NBB Models feature one or two IEC 60320 C20 inlets with detachable cables while othe...

Страница 10: ...econds and then release it b The NBB will reboot it s operating system all plugs will be left in their current On Off state 2 Set Parameters to Factory Defaults a Simultaneously press both the Default...

Страница 11: ...is applied to the NBB the ON LED on the instrument front panel should light and the RDY LED should begin to flash within 90 seconds indicating that the unit is ready to receive commands Note To deter...

Страница 12: ...Status Screen Text Interface 3 4 Controlling Power Outlets If you wish to verify that the NBB is operating properly before deploying the unit in a working network environment proceed as follows to co...

Страница 13: ...iven to supply connections when connecting to power strips rather than directly to the branch circuit Some NBB models include two power inlets 4 2 1 Connect the NBB to Your Power Supply Refer to the c...

Страница 14: ...ertain that the Serial Port Mode is set to Normal as described in the WTI Firmware Guide 4 4 2 Connecting an External Modem When connecting directly to an external modem use the optional DX9M RJ KIT n...

Страница 15: ...cy Shut Off feature please contact WTI Tech Support at service wti com This completes the NBB Hardware Guide Prior to placing the unit into operation it is recommended to refer to the WTI Firmware Gui...

Страница 16: ...Apx 1 Appendix A Specifications Physical Environmental Width 1 75 4 5 cm Depth 3 5 8 9 cm Height 68 75 174 6 cm Zero Rack Units Operating Temperature 32 F to 122 F 0 C to 50 C Humidity 10 90 RH...

Страница 17: ...r Modem Mode the DTR output at either port reflects the DCD input at the other end b If neither port is set for Modem Mode DTR output is held high active 2 When not connected a If the port is set for...

Страница 18: ...on of the mounting button holes this allows the NBB to be mounted on the posts at the rear of the equipment rack or in some cases mounted on the outside of the rack corner posts 1 Determine the Approp...

Страница 19: ...equipment rack includes appropriate mounting button holes and then attach the NBB unit to the rack by inserting the Mounting Buttons into the Mounting Button holes When the NBB is in place slide the u...

Страница 20: ...ith the mounting brackets The Mounting Plates can either be attached to the back or side of the unit and the unit can also be installed to face the front rear or either side of the equipment rack 2 At...

Страница 21: ...an be attached to the NBB unit using the three pairs of screw holes on either side of the NBB unit Use screws supplied with the Mounting Bracket kit to secure three Mounting Brackets on one side of th...

Страница 22: ...ed from the power source If the NBB unit includes dual power inlets make certain that both power inlets are disconnected 1 Refer to Figure 2 1 to locate the mounting holes for the cable retainer bars...

Страница 23: ...e of the unit its serial number and a description of its symptoms If the unit should need to be returned for factory repair it must be accompanied by a Return Authorization number from Customer Servic...

Страница 24: ...mation and descriptions contained herein are the property of Western Telematic Inc Such information and descriptions may not be copied disseminated or distributed without the express written consent o...

Отзывы: