background image

1

WS-VC-CBTA

Vehicle  Connector  Boot

Содержание WS-VC-CBTA

Страница 1: ...1 WS VC CBTA Vehicle Connector Boot...

Страница 2: ...rt at 1 800 971 7201 7am 330pm PST Shipping 815 Conger St Eugene OR 97402 PO Box 2729 Eugene OR 97402 USA Phone 1 541 344 7267 Toll Free 1 800 971 7201 Fax 1 541 284 2820 www WesternShelter com A Warn...

Страница 3: ...nch hazard Always wear gloves when raising or striking the shelter Setup entails working with rigid metal components bearing significant weight A WARNINGS Follow all written and common sense safety pr...

Страница 4: ...vide a full 6 foot sidewall The frame assembly shall include vented weather caps Doors shall be aluminum framed and fabric covered Cover Specifications The entire cover shall be of 14 oz vinyl covered...

Страница 5: ...5...

Страница 6: ...er where the Trailer Boot will connect Place the two folding frame sections 5 feet apart with the straight receiver blocks facing each other Place the eave bars and the ridge bar between the folding f...

Страница 7: ...ler are not quite correct wait to align them until the boot has been raised Attach the arched eave bar to the upper opening of the exposed shelter frame Attach the two angled base bars between the fol...

Страница 8: ...oward the shelter Hang the wall by aligning the angled portion of the wall with the angled receiving block Work out from the middle to both ends The end of the wall panel should align with the trailer...

Страница 9: ...black hook and loop strip on the trailer boot walls Be sure to leave enough slack to make a crisp corner where the shelter meets the boot Secure the end of the wall to the large fastening strip on the...

Страница 10: ...f the trailer will line up with the berm on the boot floor as shown It s fine to be an inch or two off in either direction You can either move the trailer or the shelter boot whichever is more conveni...

Страница 11: ...Lower the trailer door Now secure the boot floor to the air beam and boot walls Attach the boot floor to the air beam then the boot wall to the boot floor Be sure the floor lies flat Continue attachin...

Страница 12: ...rior side up fold the width of the roof panel in half 2 With exterior side up fold the edges of the floor in to meet each other in the middle 3 Starting at the wider end roll up the folded roof panel...

Страница 13: ...ng the wall After several years vinyl ages and can harden and lose its elasticity Eventually the vinyl walls of your shelter may need to be replaced if they are cracking or not stretching enough to co...

Страница 14: ...s qDry thoroughly using towels leaf blowers or sunlight 2 Insulation Panels roof walls qClean and fold on a clean surface such as the shelter floor Sweep off loose debris Remove debris from hook and l...

Страница 15: ...g material qTo repair a damaged area thoroughly clean with soap and water qAllow to dry completely qCut out a piece of vinyl fabric slightly larger than the damaged area qOnce completely dry apply a l...

Отзывы: