It must be noted that there is no demagnetization provision on the WC-9UW, 
so parts will have some residual field in them after inspection.  The workpiece 
can be tested with a Magnetic Field Indicator, such as the W-Series W-FI

, to 

measure the residual magnet field.  

 

5. Operation:

 

Position the Pole Pieces (Feet) on the work piece.  The area between the 
pole pieces is your target area, which also extends laterally out, 
approximately 1.5” (38mm), from either edge of the pole pieces.  The Field 
will expose defects that are transverse to the centerline between the Pole 
Pieces.  The Pole Pieces should be positioned so that as much of their 
contact surfaces as possible, are on the work piece.  The Yoke is then 
energized, by pressing Push Button Switch, and Magnetic particles are 
applied.  Dry Method Particles are dusted between the Pole Pieces and over 
the target area, while Wet Method Particles are sprayed in a similar manner. 

 

The Target Area is then inspected visually for a collection of Particles around 
defects.  A Black Light is used to aid visual inspection when Fluorescent 
Particles are used.  Indications found with Dry Powder will tend to form 
immediately, and will take slightly longer with Wet Method Particles.  If the 
typical direction of defects is not known, rotate the Yoke through 90º and 
repeat the inspection of the target area. 

 

The WC-9 produces a standard amount of Field Blow as other DC Yokes.  
Field Blow is a collection of Inspection Media between the Pole Pieces, 
transverse to the centerline between the Pole Pieces, and may cause a 
masking of indications.  Field Blow can be minimized by extending the Pole 
Pieces farther apart, If work piece configuration does not permit extending 
Pole Pieces, reduce the contact area of the Pole Pieces on the workpiece.  
Follow the Operational Parameters outlined in these instructions 

 

6. Maintenance – 

While performing maintenance, or cleaning, the Yoke 

should be disconnected from any power source, with safe industrial 
practices employed.  

 

 

After use the Yoke should be fully disassembled and cleaned with a mild 
soap solution, and dried immediately.  Drying can be accomplished rapidly by 
heating the disassembled Yoke “Frame” (cast housing and articulating legs 
only) in an oven below 150

°

F (70

°

C). The unit should be visually inspected 

for any damage that could cause harm to the operator, or the material being 
inspected.  Included in the WC-9UW Kit is a supply of 

LPS 3 Heavy Duty 

Rust Inhibitor

, and after the unit has been cleaned and dried, the Pole Pieces 

need to be coated to avoid rust.  Furthermore, the Junction Tube, Battery 
Collar, and Switch Plunger (all steel parts) should also be inhibited to avoid 
corrosion. 

 

All Electrical Connections; inside the Yoke’s Junction Tube; on the Battery 
Pack; and both ends of Switching Module also need to be cleaned after every 

Содержание WC-9UW

Страница 1: ...6720 Sturgeon County Alberta Fax 780 459 7837 T8T 1M1 E Mail nfo westernisntrments com Web www westerninstruments com Operating Instructions May 2005 WC 9UW Underwater Cordless DC Yoke E s t a b l i...

Страница 2: ...o the connector at the bottom of the Junction Tube Ensure the Urethane Spring is positioned in the bottom of the Junction Tube and line up the Connectors in the bottom of the Junction Tube and on the...

Страница 3: ...ottom of the Junction Tube Ensure the Urethane Spring is positioned in the bottom of the Junction Tube and line up the Connectors in the bottom of the Junction Tube and on the Switching Module Careful...

Страница 4: ...Pack The operator plugs the Charger s 13 2 Volt Connector into the Receptacle on the Battery Pack and should note if the Red Charging LED comes on Do not attempt to charge the Battery Pack with any ot...

Страница 5: ...Electronic Module but is imposed to avoid rapid draining of the Battery Pack A fully charged Battery Pack will last 2 hours under continuous activation which equates to approximately an 8 hour shift...

Страница 6: ...the inspection of the target area The WC 9 produces a standard amount of Field Blow as other DC Yokes Field Blow is a collection of Inspection Media between the Pole Pieces transverse to the centerli...

Страница 7: ...ective action 7 Warranty Western Instruments warrants this product against defects in materials and workmanship for a period of 3 months from receipt by the end user If Western Instruments receives no...

Страница 8: ...ations Model WC 9UW Battery Voltage 13 2VDC Current Draw 0 5 Amps 13 2 Volts DC Charger Voltage 115VAC or 230VAC Adapter K Capacity 50 Pounds 22 7 Kg Pole Spacing 0 11 0 280mm Weight 7 8 Pounds 3 5 Kg...

Отзывы: