background image

030-101704 Rev. C

R

Section VE2-848-CK6-20A

6

1006IARC

Figure 8.  Installing Keystone-type Couplers into LGX Panel

Insert coupler of choice from
the rear of the LGX-type panel.
Depress tab and 
insert into hole until
it snaps/locks into place.

Pull Nylatch fasteners
to remove LGX-type

after inserting couplers

Remove

rear of 

covers from

blank hole

panel then re-install

LGX-type panel.

Front Tray

Flange with hole for mounting

to panel’s inside wall flange

Screw to

Cable tie-down

Attach tray

the inside wall

Figure 9.  Installing Front Cable Management Tray

to flange on

1. Locate the two, small, vertical flanges at the inside of the panel

which are used to mount the front tray.

2. Align the front tray’s mounting flange holes with the correspond-

ing holes in the flanges located on the inside of the panel.

(see DETAIL A, rear

3. Insert the provided screws through both holes in the aligned

flanges, and tighten the screws.

4. Secure cables to tray with cable ties at the provided bridge-

forms or cable tie-downs.

view of VE-2848C-K6

for view of flange)

DETAIL A

Flange

Rear View

secure tray

to panel

4. Repeat for each couple and cable.

2.5.5

Labelling Circuit Positions

A circuit identification card (label) is provided, inside a clear
plastic packet, for quick and easy circuit labelling and identifi-
cation. The ID card and packet hangs from the panel using the
provided, beaded, removable, cable tie.

3

ACCESSORIES

3.1

Coupler Types

VirtualEdge

r

 panels and adapter panels accept multiple cou-

pler types (listed below) that can be used or interchanged
within the panel. If desired, couplers can be purchased sepa-
rately using the part numbers shown in Table 4.

S

RJ45/48 (Cat5e for Ethernet and DS1 services)

S

BNC (for DS3 service)

S

SC/LC (for fiber)

S

Any Keystone-type coupler

3.2

Front Cable Management Tray

To facilitate cable management at the front of the
VE-2848C-K6, Westell offers a metallic Cable Management
Tray (Figure 9). This tray attaches to the unit as shown in
Figure 9. The tray is designed to allow jumpers and cables to
cross in front of the panel without putting unnecessary down-

1. Pick the set of holes (in panel or ear) to use to mount the D-ring.

2. If installing a D-ring to the holes provided on the right side of the 

panel, first remove the protective connector box cover (to access 
the rear of the top D-ring hole) from the panel by removing the two 
screws on the top surface, one on the left side, and one on the rear. 
If any cables are attached at the back side, disconnect them.

3. Align peg (semi-perf) at the back of the D-ring with the bottom

mounting hole in the panel or mounting ear; the peg prevents rotation of the D-ring when properly installed.

4. Align the top hole of D-ring hole with corresponding panel or ear hole and insert the provided screw, from

the back side, through the aligned set of holes (panel and/or ear hole and D-ring hole). Tighten screw.

5. Route cables through slit in the front side of the D-ring. Re-install box and cables, if removed.

Figure 10.  Installing Cable Management D-Rings to the Panel

D-ring

D-ring also can

be mounted here

Insert peg

(peg near bottom of D-ring

Slit for 

cable access

(optional)

of D-ring here

provides rotational stability)

Peg

D-ring mounting screw

(see

DETAIL A)

DETAIL A

(see DETAIL A)

Protective connector

box cover

ward force or strain on the couplers, when installed. The tray
also has bridge-forms or cable tie-downs to allow technicians to
dress and secure cables to the tray, if desired. The tray can be
mounted to the panels at two different depths to allow custo-
mization based on the amount of cables and jumpers running
across the panels. Use alone or with one or more D-rings de-
scribed in Paragraph 3.3 for a customized cable-management
solution.

3.3

Cable Management D-Rings

Optional, metallic D-rings (Figure 10), for installation at ei-
ther or both ends of a VirtualEdge panel, provide guidance and
support of the cables that run across the front of the panel to
the couplers. In the front of the D-ring, a diagonal slit allows
existing or newly-installed cables/jumpers to be easily inserted
into the ring, without re-feeding or re-routing, and the 3" ring
depth easily accommodates up to 24 or more cables. At the
back of the D-ring, a shallow peg serves as an anti-rotation de-
vice when properly inserted into the bottom hole of the dual
hole-set in the panel or mounting ear. The top, threaded, 10-32
hole at the back of the D-ring accepts the short screw (provided
with the D-ring) that is inserted or threaded from the rear side
of both the D-ring and mounting ear (or panel, if the panel
holes are used). Use one or more D-rings alone or with the tray
described in Paragraph 3.2 for a customized cable-manage-
ment solution.

3.4

Larger Cable Lacer (Towel) Bar

The panel comes equipped with a 16.56" wide, 2.34" deep, lacer
or towel bar installed on the front of the panel (as shown in
Figure 1) to allow cables to be laced around or hung from the
bar for proper support of the cables that connect to jacks or
couplers at the front of the panel. This bar can be used whether
the panel is wall or rack-mounted. Westell also offers an op-
tional, larger, lacer bar (see Table 4) for rack mounting only,
which is 4" deep and 19" wide, and which is installed on the pan-
el’s mounting ears (not on the panel itself). The larger bar can
be used with or without the smaller bar, or with or without op-
tional D-rings.  Lace, hang, or tie-down cables around, from, or
at the lacer bar of choice, per company practice.

Содержание VirtualEdge VE-2848C-K6 1-RU

Страница 1: ...ded inside a clear plastic packet which allows installers to label each cou pler and jack position The VE 2848C K6 comes equipped with the components shown in Table 1 Optional features in clude couple...

Страница 2: ...andFigure 3 provide further details Screws to attach the mounting ears to the panel are provided as well as screws to mount the panel to a rack 2 1 Mounting in a 19 Rack The panel is shipped from the...

Страница 3: ...hardware provided The ear s short flange abuts the panel 5 Attach panel to rack Lift the panel and attach it to the rack channels in the correct vertical rack position Align the holes in the ear s lon...

Страница 4: ...alling Couplers Provided with the VE 2848C K6 panel is a detachable LGX type panel which contains 6 Keystone type coupler positions see Figure 8 equipped with blank hole covers Order and install coupl...

Страница 5: ...C cable 32 pair male Amphenol cables field provided 3 Perform cable management on the cable per company practice using the cable tie downs on the panel s rear tray 4 Connect cable to RCV IN connector...

Страница 6: ...the D ring when properly installed 4 Align the top hole of D ring hole with corresponding panel or ear hole and insert the provided screw from the back side through the aligned set of holes panel and...

Страница 7: ...57 email rgmdept westell com Replacements will be shipped in the fastest manner consistent with the urgency of the situation Westell will continue to repair or replace faulty equipment beyond the warr...

Отзывы: