
7
Figure 3-2
Battery connecting
Before battery is connected, make sure that battery voltage is greater than 6V so as to
start up the controller. If system is 24V, make sure battery voltage is not less than 18V.
System voltage can only be automatically recognized when controller start up for the first
time. When install fuse, make sure that the biggest distance between the fuse holder and
the positive terminal of battery is 150mm. Do not insert a fuse at this time. Confirm the
connection correct and
turn on the power.
Step 2: Load Wiring
The controller loads can be connected to such electrical equipments as lights, pumps,
motors and others. Controller offers power to loads through the battery voltage.
Figure 3-3
Load Wiring
Battery
Fuse
Fuse
Load