CR19
16
B
- HOW TO ASSEMBLE THE OUT-
DOOR SCAVENGING PIPE
C
- HOW TO POSITION THE UPPER
STACK WALL CLAMP
B
– MONTAGE TUYAU EVACUATION
EXTERNE
C – POSITIONNEMENT DE LA BRIDE
ANCRAGE CHEMINEE SUPERIEURE
B - MONTAGE DES
ABLUFTSCHLAUCHES
C - POSITIONIEREN DES
BEFESTIGUNGSFLARISCH FÜR
DEN OBEREN KANAL
Fig. 5
Содержание WH QUADRO 5
Страница 11: ...CR19 11 A B C D E F G...
Страница 12: ...CR19 12 A B C D E F G...