2
INSTALLATION
For safe installation of the Play Detector, avoiding risks to third parties as well as to the per-
sonnel performing the work, we recommend to follow instruction below:
Verify the max pressure of the main hydraulic unit do not exceed 185 bar.
Verify that main supply line could deliver 230V - 50Hz - 1Ph, or 400V - 50Hz - 3Ph.
Verify that inside the main control unit could deliver a voltage of 24V 50Hz.
In order to fix both platforms of play detector to recess verfy that the following holes are provi-
ded in the base surface of each plate recess.
8
HOSES LENGTH
Содержание OMA 547SPF
Страница 2: ...2...
Страница 16: ...6 ANNEXES PARTS LIST WIRING DIAGRAMS AND HYDRAULIC THREE PHASE wirning diagram SINGLE PHASE wirning diagram 16...
Страница 18: ...18...
Страница 19: ...19...
Страница 22: ......