1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Erection
(Base Pack)
1.5m Configuration Erection
(Base Pack, Guardrail Pack & Toe Board Pack)
1.5M CONFIGURATION
Base Pack
1.5M CONFIGURATION
Base Pack + Guardrail Pack + Toe Board Pack
ENGAGE
SPRING CLIPS
INSTALL HORIZONTAL BRACES ON
THE INSIDE OF THE STANDARDS
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Assembly
(Base Pack)
1.5m Configuration Assembly
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Assembly
(Base Pack)
1.5m Configuration Assembly
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Assembly
(Base Pack)
1.5m Configuration Assembly
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Assembly
(Base Pack)
1.5m Configuration Assembly
(Base Pack, Guardrail Pack & Toe Board Pack)
UNLOCKED
UNLOCKED
LOCKED
LOCKED
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Erection
(Base Pack)
1.5m Configuration Erection
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Erection
(Base Pack)
1.5m Configuration Erection
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Erection
(Base Pack)
1.5m Configuration Erection
(Base Pack, Guardrail Pack & Toe Board Pack)
1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
UNLOCKED
LOCKED
UNLOCKED
LOCKED
4. Install Platform
1. Install Guardrail End Frames
2. Engage Spring Clips
3. Install Horizontal Braces
4. Install End Toe Boards
5. Install Side Toe Boards
ENGAGED
Install Horizontal Braces on the
inside of the Standards.
1.5m Configuration Erection
(Base Pack)
1.5m Configuration Erection
(Base Pack, Guardrail Pack & Toe Board Pack)
2
1.
Unfold Base Pack
2.
Lock Brace Locks
3.
Lock Castors
4.
Install Platform
1.
Install Guardrail
End Frames
2.
Engage Spring Clips
3.
Install Horizontal Braces
(YELLOW)
4.
Install End Toe Boards
5.
Install Side Toe Boards