5
minimaxtower.com
•
Tools and materials should be lifted using a reliable lifting material (e.g. a strong
rope) employing a reliable knot (e.g. clove hitch) to ensure safe fastening and
always lift within the footprint of the prefabricated tower scaffold (i.e. within the
area bounded by the stabilisers).
•
Check this manual is available and its contents familiar to all those involved.
•
If assembling outdoors; check the forecast windspeed.
º
The assembled tower is certified to wind forces
equating to 27mph, but handling components under
those conditions would be hazardous.
º
Also consider the wind funnelling effect of nearby
buildings.
•
This structure is designed to be self-supporting under the loading condition
requirements of EN 1004-1:2020 and does not require tying in. Consideration
should be given to potential wind conditions if the tower is left unattended.
2
Building The Tower
27mph
12m/sec
PN00063300_Minimax_IM_RevD 0522.indd 5
PN00063300_Minimax_IM_RevD 0522.indd 5
01/06/2022 10:54
01/06/2022 10:54