
SMP180 IRD Quick Installation Guide
V1.1-N
between each group to ensure good air ventilation.
PIC-1.1-2
1.2 Wiring
Connection
Before setting up the connection, please turn off the equipment and all other
connected external devices. The equipment and all connected external devices are
required grounded. Turn on the devices only after the wiring connection is completed.
Otherwise the device may be damaged.
Follow the below connection diagram to set up cable connection:
PIC-1.2-1
z
Set up cable connection for input signal: either the LNB input (area 1), ASI input (area 2)
or TS/IP input (area 4)
z
Set up cable connection for output signal: either through ASI (area 3) or TS/IP (area 4)
z
Set up connection for network management control: shown in area 5.
1
2 3
4
5