Service Manual
Repair Procedures
85
Opening the SpO
2
Module
1.
Separate the SpO
2
module from the monitor (
“Removing the Dual Battery in SpO2
2.
Two tabs secure the SpO
2
module rear panel to the SpO
2
module chassis. Using a
small screwdriver or your finger, press on each of the tabs inside the SpO
2
module
chassis while applying pressure to separate the rear panel from the chassis, as shown
here. (When separating the rear panel from the chassis, make sure the side panels
remain seated in the rear panel.)
3.
Once the tabs allow the rear panel to be removed, separate the rear panel from the
chassis.
The rear panel is sealed to the chassis with rubber O-ring gaskets. These gaskets can
be reused when re-assembling the SpO
2
module.
When closing the SpO
2
module, verify no O-ring gasket slips out of its channel and
becomes pinched between the rear panel and the chassis.
SpO2 Module
Rear Panel
Release
Tabs
Continuous
O-Ring Gasket
0696-53
Rear
Panel
O-Ring
Cord
Release
Tab (2)
SpO2
Board
SpO2
Connector
Panel
Chassis
Speaker
SCP Board
Содержание Propaq Encore
Страница 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Страница 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Страница 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 130: ...126 Dynatech Nevada Patient Simulator Modification Welch Allyn Propaq Encore Vital Signs Monitor...