
ONE
27
Original instructions.
USER PROGRAMMING 2B
The ONE 2B machines are equipped with a programmable ’Barista’ interface that allows users to set
or adjust the following features and parameters with guidance from the digital display:
Power off/on (without using the main switch).
GSP (Gradual Soft Preinfusion) settings. (Rotary Pump versions only).
Adjust the steam and group boiler temperatures.
ECO & Stand-by mode settings (set up energy saving mode timers).
Heating elements On/Off.
Clock and Date settings (adjust current time and date).
Shot screen time.
Counters (volume of water cycled, service intervals, and number of coffees dispensed, etc.).
Temperature units
Date format
USB interface (LFPP version only)
Barista knob resolution (LFPP version only)
K2
K4
Selection buttons K1 - K2 - K3 - K4
K1
K3
To access to the Barista menu, just press (K2)
Then you can browse through the menu using the buttons K1 & K2 with the icons ( ) & ( ).
Press home icon ( ) to come back to idle screen.
The icons of each parameter will be shown on the down side of the display and you can access by
using K3 & K4.
· User Interface 2B
· Barista menu - Access & browsing
On Barista menu, access to GSP ( ) settings.
GSP allows to select the preinfusion time while the machine gradually increases the pump pressure
up to the adjusted brewing pressure.
Use the following steps to adjust the GSP settings:
Activate and deactivate GSP function by choosing between Disable ( ) and Enable ( )
When activated, choose the GSP time between Off (Time disabled) to 30 sec. Default setting 10 sec.
Use the
▲
/
▼
arrows to adjust each setting. Then use the icon (
) to confirm.
· Gradual soft preinfusion (GSP) menu (Rotary pump versions only)
Содержание CREM EAEB-I91F-13AP
Страница 1: ...ONE User Manual UM_EN Part No 1964195_06...