ARC-E 400
10
2. Installation
The machines are portably designed, can be effortlessly moved by operators without fix-up. But it
should be settled in even and dry places with well ventilation.
(1)
Ensure the welding cable be connected to the power source firmly.
(2)
Adjust every knobs, and switches on the front panel to proper position in line with selected mode.
(3)
Turn on the circuit breaker on the power source.
(4)
Connect input 3 phase primary power cable to switch box.
Figure 4: Outside connection diagram of ARC-E series
Attention: Before you plug the welding cable, please turn off the power and rightly calibrate the plug key
to the socket slot at first, then insert and turn the plug clockwise until it firmly seated. Make sure the
plug and the socket are well-connected to be sound conductivity in case that they are burnt out by over
resistance heat.