background image

 

 
 
 
 
 
 
 
 

Installation and Startup Guide

 

This document covers the installation of cMT-SVR Series, for the detailed specifications and operation, 
please refer to Brochure and EasyBuilder Pro User Manual. 

Install Environment: 

Electrical 
Environment

 

The 

cMT-SVR

 Series has been tested to conform to European CE requirements. 

This means that the circuitry is designed to resist the effects of electrical noise. 
This does not guarantee noise immunity in severe cases. Proper wire routing and 
grounding will insure proper operation.

 

Environmental 
Considerations

 

(1)  Make sure that the units are installed correctly and that the operating limits 

are followed. Avoid installing units in environments where severe 
mechanical vibration or shocks are present. 

(2) 

Do not operate the unit in areas subject to explosion hazards due to 
flammable gases, vapors or dusts.

 

(3)  Do not install the unit where acid gas, such as SO2 exists. 

(4) 

This device should be mounted in the vertical position and for use on the flat 
surface enclosure.

 

(5) 

Conform to UL508 (ISBN 0-7629-0404-6) machine safety for use in 
Pollution Degree 2 Environment.

 

 

Unpacking the Unit

 

Unpack and check the delivery. If damage is found,   
notify the supplier.   

Installation Instructions 

Rail mounting: DIN rail 35mm 
Panel mounting: Use two M4 or #8 panhead screws, mounting hole size is 4.6mm 

 

Power Connections 

 

System Settings 

Connect cMT-SVR with a router via RJ-45 Ethernet cable. Launch Cloud EB Pro on PC or iPad, find the 

cMT-SVR and use the default password 

“111111” to log in and configure. 

 

 

cMT-SVR series 

 

Installation Instruction 

 

NOTE:   

Place the unit on a stable surface during 

installation. Dropping it or letting it fall may 

cause damage. 

 

NOTE:   

Conne

ct positive DC line to the ‘+’ terminal and 

the DC 

ground to the ‘-’ terminal. 

 
To make a connection, strip about 3/8” of 
insulation off the end of the wire, turn the 
connector screw counterclockwise until the gap 
is wide open, insert the wire all the way in, and 
turn the screw clockwise until it’s tight. 

 

(1) Installation Instruction, A4 double sided *1 

(2) Power Connector *1

 

(3) cMT-SVR *1

 

(1) 

 

 

 

 

 

(3) 

 

(2) 

                                                       www.ipc2u.ru

Отзывы: