Weil-McLain Ultra Series 3 Скачать руководство пользователя страница 3

TRIM OFF HERE

VENT & AIR PIPING

(see boiler manual for details)

Slide the air inlet pipe and vent pipe into the boiler top 

openings. Just tighten the restraining rings — no messy 
sealants required. Reducers or adapters are required when 
the vent / air pipe O. D. is different from the boiler connection 
diameter (see below). All AL29-4C stainless pipe applications 
require adapters made by the vent pipe manufacturer. See 
the material checklist for items required.

Ultra boilers can be sidewall vented or vertically vented 

as shown in the five options below and in the manual.

Make sure the terminations are placed as required in the 

manual and that air intakes are at least 12 inches above 
normal snow line.

Vertical 

3” Concentric Pipe 

termination

(requires W-M kit)

Vertical 

 Separate Pipes  

termination

(requires 2 bird screens)

Sidewall with 

Weil-McLain 

termination

(included with boiler)

Sidewall with 

Separate Pipes 

termination

(requires 2 bird screens)

Air inlet can be snorkeled up as shown above. 

See manual for details.

Sidewall with 

3” Concentric Pipe 

termination

(requires W-M kit)

33

Support pipes as 
described in the 
manual.

Vent / air pipe size options (PVC sizes):

Ultra-80, 105:  2" or 3”
Ultra-155:  3"
Ultra-230:  3" or 4”
Ultra-299, 399:  4”

Slope pipes ¼”

 per 

foot t

owar

d boiler

.

Отзывы: