
Part number 550-100-086/0809
7
COMMERCIAL
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
Prepare boiler location
(continued)
Placing multiple boilers
Locate multiple boilers in boiler room to provide
1.
the clearances shown in:
a. Figure 2 (side-to-side), or
b. Figure 3 (back-to-back).
Provide indicated clearances around boilers for ac-
2.
cess and servicing. If recommended dimensions are
not possible, provide at least the minimum clear-
ances given on page 6. Also follow local codes.
Construct boiler foundation if boiler room floor
3.
is uneven or if there is a danger of flooding. Size
foundation to allow for clearance and spacing di-
mensions shown in either Figure 2 or Figure 3.
Chalkline boiler locations on foundation or boiler
4.
room floor.
Uncrate, assemble and mount boilers according to
5.
instructions in this manual.
Provide clearance for installation of venting, air
6.
piping, gas piping, condensate piping and compo-
nents, expansion tank, boiler circulator and other
accessories.
Side-to-side mounting of multiple Ultra boilers
&IGURE
Back-to-back installation of multiple Ultra boilers
&IGURE