background image

Part Number 550-141-816/0798

Contents

I.

New installation .......... 2

II.

Existing installation .... 4

III. Water and steam trim

components .................. 4

IV. Gas piping ................... 5

V. Wiring ........................... 5

Sequence of operation ..... 8
Wiring procedure .............. 8

VI. Leak test procedure ... 10

VII. Operating instructions ..... 1 1

VIII.Parts list ..................... 12

Indicates presence of hazards that can cause severe personal injury, death or
substantial property damage.

Indicates special instructions on installation, operation or maintenance that
are important but not related to personal injury or property damage.

This Control Supplement must only be used by a qualified installer/service
technician. Read these instructions completely before beginning the
installation. Failure to follow these instructions can cause severe personal
injury, death or substantial property damage.

These terms are used throughout this

manual to bring attention to the

presence of hazards of various risk

levels or to important information

concerning the life of the product.

LGB

Gas–fired boiler

CSD-1 Control System

Control Supplement

LGB-6 

to

 LGB-20

 Series 2

 – 

Propane gas

Содержание LGB 6-20 Series

Страница 1: ...normaintenancethat are important but not related to personal injury or property damage This Control Supplement must only be used by a qualified installer service technician Read these instructions com...

Страница 2: ...box to interior jacket panel See Figure 6 page 12 Connect thermocouple from standing pilot to switch box Cut 60 pilot tubing into 2 pieces to make connections from pilot valve to pilot switch box and...

Страница 3: ...Part Number 550 141 816 0798 3 CSD 1ControlSystem Propanegas Figure 1 Pilot burner assembly typical Figure 2 Main flame sensor assembly I New installation continued...

Страница 4: ...3 Wire per wiring instructions and wiring diagrams pages 5 9 Add splices as needed 14 Attach a 550 223 710 label at boiler operating instruction label Place so that this label reads first b 550 223 79...

Страница 5: ...any pressure test greater than 13 W C Do not check for gas leaks with an open flame BUBBLE TEST Failure to use bubble test or test for leaks can cause severe personal injury death or substantial prope...

Страница 6: ...WIRE NUTS 4 RESET HIGH LWCO LIMIT MANUAL RESET HIGH LIMIT MANUAL NOTE 8 SIZES 6 THRU 20 NO 1 BASE WIRING SOLENOID SWITCH WHEN USED PRESSURE HIGH GAS NOTE 11 PILOT MV MV PV PV R NOTE 6 W BL NO 1 RED FL...

Страница 7: ...ps 250 V To reset the boiler push the red lockout button V Wiring continued 1 Determine right or left electrical supply wiring 2 Attachelectricaljunctionbox es toinsidejacketend panel Screws and nuts...

Страница 8: ...Part Number 550 141 816 0798 9 CSD 1ControlSystem Propanegas Figure 5 Field wiring diagram...

Страница 9: ...meter to second leak test valve 8 Apply call for heat to boiler 9 Check that electronic pilot proves 10 Open second leak test valve and check for pressure 11 Close second leak test valve and remove ma...

Страница 10: ...ontrol system and any gas control which has been under water Starting boiler 1 STOP Read the safety information above 2 Set the Operating control to lowest setting 3 Turn off all electrical power to t...

Страница 11: ...lot proving module United Technologies 1003 615 511 330 086 10 Main flame proving module United Technologies 1003 60 511 330 085 11 Impulse relay Potter Brumfield S89R 11ABD1 24 510 350 226 12 Push bu...

Отзывы: