C-809(0308)
3
•
Port openings must be of captured seal design – a machined groove assures uniform
compression of the sealing ring and protects the seal from contaminants. Elastomer
sealing rings are to be used to provide permanent watertight seal between sections.
Unlike cast iron or steel push nipples, the elasticity of the seals fills any gaps caused
by misalignment or expansion or contraction.
•
Shipped with insulated heavy gauge steel jacket(s) with durable powdered paint
enamel finish. Jacket designed to be installed after connecting supply and return
piping.
Side panels can be removed without tools for easy servicing.
D.
Tankless heaters or indirect water heaters
•
Provide ( ) internal tankless water heater(s) inserted into the left hand side of the
tankless intermediate (TI) section in the opening provided. Allow 34” minimum
clearance on left side of boiler for cleaning and servicing. Tankless openings must be
on same side as the flue passage cleanout plates to minimize space requirements.
E. Boiler
foundation(s):
•
Installer to construct needed support and level concrete foundation(s) where boiler
room floor is uneven or will not support the weight of the boiler(s).
F. Boiler
trim:
1. All electrical components to be of high quality and bear the U.L. label.
a) Water boiler(s) controls furnished:
1) Combination low temperature limit (operating) and
manual reset
high
temperature limit control.
2) Low temperature limit set according to system design. High temperature limit set
at least 20
°
F higher than the low limit (240
°
F is the maximum allowable water
temperature).
3) Combination
pressure-temperature gauge with dial clearly marked and easy to
read.
4) ASME certified pressure relief valve, set to relieve at 30 PSIG. Optional relief
valves available up to and including maximum allowable pressure. Side outlet
discharge type; contractor to pipe outlet to floor drain or near floor, avoiding any
area where freezing could occur.
b) Steam boiler(s) standard controls furnished:
1) Low pressuretrol (operating) and high pressuretrol set at maximum pressure as
a safety control.
2) Steam pressure gauge with dial clearly marked and easy to read.
3) Gauge cock water set with gauge glass, guards and aluminum water level plate.
4) ASME certified pressure relief valve, set to relieve at 15 PSIG. Side outlet
discharge type; contractor to pipe outlet to floor drain or near floor, avoiding any
area where freezing could occur.
c) Low water cut-off for water or steam boiler(s):
1) Boiler(s) to be furnished with U.L. labeled low water cut-off with ASME working
pressure rating equal to the ASME rating of the relief valve.
2) Do not use quick-connect fittings on boiler(s).
3) Install cut-off according to manufacturer’s instructions.