Optional reservoir piping:
Modern steam boilers are designed to steam for
less time than older, larger boilers. When replacing
an older steam boiler, the system condensate
return time may be longer than the steaming time.
This can cause the following problems:
•
Boilers fitted with an automatic water feed
could overfill.
•
Units fitted with only a low water cutoff would
shut down and cycle while waiting for
condensate to return.
To size and install reservoir piping, see FIGURE 11
and Bulletin AE-8403 (available through your
Weil-McLain distributor or sales office):
1. Pipe boiler as shown on pages 14 through 16.
2. Use 8" diameter reservoir pipe.
3. Locate centerline of reservoir pipe 1" below
26
7
/
8
" boiler waterline.
Connect Steam Piping
CONTINUED
CONDENSATE RECEIVER CAPACITY TABLE
MINIMUM CONDENSATE RECEIVER CAPACITY – GAL.
RECOMMENDED
I=B=R GROSS
CONDENSATE
OUTPUT
GALLONS
15 MIN.*
30 MIN.*
45 MIN.*
60 MIN.*
FEED PUMPING RATE
BOILER
LBS STEAM
CONDENSATE
BOILER
BOILER
BOILER
BOILER
GPM
MODEL
PER HOUR
PER HOUR
OPERATION
OPERATION
OPERATION
OPERATION
AT 15 PSI
SGO-3
114
14
4
8
12
16
0.5
SGO-4
150
18
5
11
16
22
0.6
SGO-5
180
22
6
13
19
26
0.7
SGO-6
216
26
8
16
23
31
0.9
SGO-7
246
30
9
18
27
35
1.0
SGO-8
274
33
10
20
30
39
1.1
SGO-9
303
36
11
22
33
44
1.2
* Maximum time to when condensate returns to boiler.
Содержание 550-141-829/1201
Страница 9: ...Install Non Packaged Boiler CONTINUED ...
Страница 11: ...Install Packaged and Non Packaged Boiler ...
Страница 15: ...Connect Steam Piping CONTINUED ...
Страница 16: ...Connect Steam Piping CONTINUED ...
Страница 20: ...20 Connect Wiring CONTINUED ...
Страница 22: ...22 Connect Wiring CONTINUED ...
Страница 29: ...Parts Drawing ...
Страница 31: ...Dimensions CONTINUED ...
Страница 32: ......