9
10. Attach the Curl Pad (45) to the Curl Post (27) with
two M6 x 16mm Screws (29).
10
45
27
29
11
49 34
25
47
14
34
33
49
12
19
48
14
12
33
19
13. Insert the Inner Bar (43) into the Outer Bar (40)
and align the indicated holes. Using a hammer,
tap the two Roll Pins (41) into the holes until they
are flush with the Outer Bar.
13
43
40
41
41
Holes
Holes
11. Route the Cable (19) through the Lat Tower (14)
and over the Pulley (25).
Make sure that the
Cable is under the lat bar rest.
Attach the Pulley
inside the Lat Tower with an M10 x 50mm Bolt
(47), two M10 Washers (34), two 10mm Large
Spacers (49), and an M10 Locknut (33).
12. Insert an M10 x 19mm Bolt (48) into the bracket
on the Weight Carriage (12).
Slide the Weight Carriage (12) onto the Lat Tower
(14).
Make sure that the bracket on the Weight
Carriage and the lat bar rest (see step 11) on
the Lat Tower are on opposite sides of the Lat
Tower.
Attach the Cable (19) to the M10 x 19mm
Bolt (48) with an M10 Locknut (33).
Lat Bar
Rest
Bracket
14.
Make sure that all parts are properly tightened
before the weight bench is used.
Note: Some
hardware may be left over after assembly is com-
pleted. The use of all remaining parts will be
explained in ADJUSTMENT, starting on page 10.