
M600
–
User manual
–
English (EU)
–
16/05/2018 - ISSUE 3
16
7
Start procedure
✓
Complete pre-start checks (see section 6)
✓
Press and hold priming button on regulator
✓
Start the generator by either:
•
Turning the key to position
E
and release to
position
D
when engine starts (see
•
Figure
11
) or
•
Turn the key to position
D
and double press and
hold
ON
on the remote
✓
Turn the isolator switch to position
A
(see
✓
Figure 11), the PLC screen should illuminate (see Figure
12)
Figure 11 - Details of the switches of the front panel
✓
The reset indicator (blue light) lights up and
FAULT
will
appear on the top right hand corner of the PLC screen
✓
Press the
RESET
button (blue button on the front panel,
see Figure 5), the
FAULT
indicator goes out and you
should see the screen represented in Figure 12
✓
Wait a few seconds before requesting air bleed: buttons
1
or
2
in Figure 12
If you have disconnected the water tank or are starting
for the first time of the day, please use “
Air bleed
Total
”
If you just took a break or want to perform an additional
air bleed, plea
se select “
Air bleed Partial
”
When bleeding the machine, the
trigger must be
pushed
to allow water to flow out of the lance. Failure to
do so will cause the machine to display a fault message.
✓
Once button
1
or
2
is pressed the bleed screen
represented in Figure 13 will appear.
✓
Wait until the purge is completed. A new screen will
appear, represented in Figure 14.
✓
Press
START
, the button turns green and the screen
represented on Figure 15 will appear.
✓
The amber
HEATER
light will illuminate and the red
FAULT
button should go out. This indicates that the
boiler has switched on and is heating the water
✓
The green
READY
light will illuminate when the M600
has reached operating temperature and the system is
ready for use (2
–
4 minutes).
AFTER A COLD NIGHT (BELOW 0 DEGREES CELSIUS),
LET THE GENERATOR RUN FOR 15 MINUTES TO WARM
UP THE MACHINE BEFORE STARTING THE PUMP OR
BLEEDING THE UNIT
Содержание Foamstream M600
Страница 1: ...USER MANUAL ENGLISH EU 16 05 2018 ISSUE 3 ...
Страница 2: ...M600 User manual English EU 16 05 2018 ISSUE 3 ...
Страница 18: ...M600 User manual English EU 16 05 2018 ISSUE 3 18 Figure 15 Running screen of the PLC ...
Страница 32: ...M600 User manual English EU 16 05 2018 ISSUE 3 15 Schematics Figure 22 M600 P ID ...