![Wearwell Foundation Platform Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/wearwell/foundation-platform/foundation-platform_assembly-instructions_4025796001.webp)
You’ve made a great choice. FOUNDATION
®
platforms are designed to be easily assembled on-site.
Just follow these step-by-step instructions.
Before you start, review all of the instructions. Choose where you want to build your platform.
Ensure the area is clean and free of debris then determine how you want to orient your platform.
If there is a wall or fixed object the platform will be adjacent to, it is recommended that you start
there to prevent problems later in the installation process.
PREPARATION
PREPARE THE FLOOR
REQUIRED TOOLS & EQUIPMENT
FOUNDATION is designed for interior use.
We recommend you sweep the surface of
dust and debris before beginning.
Rubber mallet
Safety gloves
Power drill and 3/16" (5 mm)
concrete bit (If securing to floor)
REQUIRED
For safety and stability, parts are
designed to fit tight. We suggest a
mallet to tap parts into place and
gloves are always good practice
when handling metal parts.
FOUNDATION PLATFORM 4
"
(10 cm)
CLEANING, TOOLS & EQUIPMENT
Leg/Beam Assembly x 2
FOUNDATION
®
PLATFORM
ASSEMBLY INSTRUCTIONS
Thank you for purchasing FOUNDATION
®
Modular Platform(s)
Copyright © 2021 by Wearwell
®
LLC, 199 Threet Industrial Rd, Smyrna, TN 37167 • 800-264-3030 • www.wearwell.com
WHAT YOU’LL NEED
SEE THE
INSTALLATION VIDEO
Tiles x 4
IFPL4
1
TO LEARN MORE
VISIT US AT WEARWELL.COM/FOUNDATION