B
C
E
A
fig. 9
B
F
D
A
fig. 10
fig. 11
Wiring diagram luminaire
E
H
G
ON-OFF
ADVANCED
BASIC
1-10 V
DALI
N
N
N
N
L1
L1
L1
L1
L2
D
D
―
+
4a) Should the cable connector
A
not fit through
the outreach bracket
C
(
fig. 9
), then this must
first be disassembled from the connecting lead,
then the connecting lead
E
can be passed
through the outreach bracket
C
. Attach luminaire
to outreach bracket
C
and tighten the fixing
screws
B
with an approximate torque of 5 Nm
(44.3 in-lb). Re-assemble the cable connector
A
to the outreach bracket (pole side).
4b) All brackets, that do not allow the cable
connector to be passed through e.g., RX0,
RI_ or other adapters, must be directly wired
through to the luminaire as follows:
Undo screws
F
on the frame. Open frame.
Unplug cable connector
E
from cable connector
G
. Unfasten cable connection screw
H
and
remove cable connecting wire
E
. Feed main
incoming cable through to cable connection
screw
H
and connect luminaire to bracket/adap-
tor. Fasten cable connection screw
H
(
fig. 10
).
Connect the cut and unsheathed wire
ø 0.354 – 0.472 in to connector
G
in line with
wiring scheme. Close frame and refasten
screws
F
.
5) Pull the connecting cable through the pole.
Attach the luminaire on the pole and tighten
the fixing screws
B
, tightening to a torque of
5 Nm (44.3 in-lb).
6) Disassembly of connector Switch off the mains
electrical supply.
In order to remove the conductor, the gland nut
should be completely unfastened and the splice
gets removed from the connector head with a
commercially bladed screwdriver (blade width
3 – 4 mm), (
fig. 7
).