background image

Surge Protection

This product features built-in surge protection circuitry in compliance
with applicable standards.
For comprehensive protection of a luminaire installation against lightning
and electrical surges, it is essential to cover mains supply and data input
lines at the distribution board level, by using respective primary (Type 1)
and secondary (Type 2) surge arrestors in compliance with EN61643-11/
IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and
activated prior to luminaire installation. Also, disconnect luminaires
before operating high-power devices such as, for example, electrical
arc welders.

Do not open during installation

This product is factory-sealed. 
Refer to the instructions contained in this 
document for details.

Installation tools

Mounting hardware used on this product 
includes fasteners with hexalobular socket 
heads (ISO 10664). Installation requires 
the use of matching tools.

WE-EF LIGHTING

Installation and Maintenance

Instructions 

Bollard

KTX234 LED

Содержание KTX234

Страница 1: ...IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as...

Страница 2: ...C Bollard ESV4 Weight H lb for KTX234 10 63 9 9 for KTY234 23 62 15 0 for KTY234 39 37 19 6 Accessories Planted root Galvanised steel lb ESV4 for KTX234 KTY234 300 0461 9 7 KTY234 H 23 62 in KTX234 H...

Страница 3: ...ith Torx T 20 tool and rotate it anti clockwise until it can be lifted up If the head of the luminaire is returned after maintenance align it to the bollard post as shown below and secure by tightenin...

Страница 4: ...H OXPLQDLUH LV PRGL HG E DQ ERG RWKHU WKDQ WKH RULJLQDO PDQXIDFWXUHU WKHQ WKH ZDUUDQW ZLOO no longer be valid and shall become the full responsibility of the modifying person organisation Claims based...

Страница 5: ...installation instruction is available at the end of this document 4 Remove head of luminaire H from bollard post B after loosening screw J with Torx T 20 tool and rotating it anti clockwise until it...

Страница 6: ...5 KTX234...

Страница 7: ...6 Direction of Light for R65 One sided set screw Torque Screw Torque M4 max 2 0 Nm 17 7 in lb M5 max 4 0 Nm 35 4 in lb M6 max 6 0 Nm 53 1 in lb M8 max 15 0 Nm 132 8 in lb M16 max 100 0 Nm 885 1 in lb...

Страница 8: ...7 www we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9241W0422 WE EF 2022 Technical specifications are subject to change...

Страница 9: ...WE EF LIGHTING Installation and Maintenance Instructions Planted Root ESV4 ESV2 ESV6...

Страница 10: ...300 0586 ESV4 300 0464 ESV4 300 0459 Suitability 1 KTX234 2 KTY234 3 ZFY230 4 GRY224 5 Short post Suitability 1 XRY334 2 XRZ334 3 RRY334 4 RRZ334 Suitability 1 CFY259 2 GRY234 3 RRY324 4 RRZ324 5 XRY...

Страница 11: ...3 Planted Root ESV2 300 9115 ESV6 300 0824 ESV6 300 0457 Suitability 1 PSY414 424 Suitability 1 AML C 2 FLA461 Suitability 1 LTM440 2 LTM444 3 AMW C 4 AMF C 5 AMF S 6 AML C...

Страница 12: ...as shown base plate is parallel to the pathway For this installation use M12 bolts supplied 2 Please note ESV4 and ESV6 must be RULHQWDWHG FRUUHFWO IRU GL HUHQW SURGXFWV In both instances conduit ent...

Страница 13: ...supplie 7 Place the ESV in the form work for concrete pad ensuring orientation position and levels are correct Ensure all openings on ESV are EODQNHG R LQFOXGLQJ PRXQWLQJ SODWH KROH 8 Fit the nominat...

Страница 14: ...rete paver or soil Ensure WKDW IRU DQ LQVWDOODWLRQ PRXQWLQJ DQJH PXVW EH XVK RU KLJKHU WKDQ VXUURXQGLQJ VXUIDFH level IWHU FRQFUHWH KDV FXUHG IRU VSHFL HG WLPH UHPRYH EODQNLQJ DQG EROWV QVWDOO WWLQJ a...

Страница 15: ...www we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9257W0422 WE EF 2022 Technical specifications are subject to change...

Отзывы: