background image

4

1)  Switch off mains electrical supply.

Installation Procedure

Installation 

t

 Flat sur

I

ace 

Ƃ

tter

 'HWHUPLQHSRVLWLRQVIRUƂ[LQJVFUHZV

D

Drill relevant holes 

and insert nylon plugs 

R

.  

Insert and tighten screws 

D

Warning: 

Ensure not to damage any electrical 

cable, water pipe or other items drilling holes.

4) Loosen screw 

M

RQVOLSƂWWHU

H

 (do not turn it 

RXWXQWLOVSOLSƂWWHUFDQEHRSHQHG&RQQHFW

luminaire 

A

ZLWKƃDWVXUIDFHƂWWHU

 T 

by sliding 

VOLSƂWWHU

H

 over pivot 

I

, while pulling luminaire 

cable 

C

 through hole 

L

 and turning luminaire 

A

 

WRZDUGVREMHFWWREHLOOXPLQDWHG(QVXUHVOLSƂW

-

ter 

H

 is properly seated on pivot 

I

, then tighten 

screw 

M

.

2)  Detach strain relief clip 

K

IURPƃDWVXUIDFH

ƂWWHU

T

Attention:

 Keep strain relief clip 

K

 for  

locking cable later (in step 5). 

Feed cable 

C

 from luminaire 

A

 through pivot 

and hole 

L

RIƃDWVXUIDFHƂWWHU

T

.

Содержание FLD121 #1

Страница 1: ...mains supply and data input lines at the distribution board level by using respective primary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that a...

Страница 2: ...1 Projector Mounting Accessories FLD121 1 FLD131 1 IP66 Class I ta 40 C CF FLD1 SF FLD1 Flat surIace tter SF FLD1 for FLD121 131 1 145 9535 ColuPn tter CF FLD1 for FLD121 131 1 145 9536...

Страница 3: ...ecial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG D...

Страница 4: ...alling and connecting the luminaire Notice I WKH OXPLQDLUH LV PRGL HG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility...

Страница 5: ...Q VOLS WWHU H do not turn it RXW XQWLO VSOLS WWHU FDQ EH RSHQHG RQQHFW luminaire A ZLWK DW VXUIDFH WWHU T by sliding VOLS WWHU H over pivot I while pulling luminaire cable C through hole L and turning...

Страница 6: ...g box J a ON OFF L Phase N Neutral Earthing b 1 10 V DALI L Phase N Neutral Earthing DA DA DALI control line D D 1 10 V control line Attention QVXUH FRQQHFWLQJ ER LV UPO tightened for proper sealing 6...

Страница 7: ...PLQDWLRQ PD LPXP P IURP FROXPQ WWHU PRXQWLQJ SRVLWLRQ 6HW DQG FROXPQ WWHU B in position Insert and tighten screws D 4 Loosen screws M RQ VOLS WWHU H do not turn out XQWLO WKH VOLS WWHU FDQ EH RSHQHG H...

Страница 8: ...to respective terminals of socket S in connecting box J a ON OFF L Phase N Neutral Earthing b 1 10 V DALI L Phase N Neutral Earthing DA DA DALI control line D D 1 10 V control line Attention QVXUH FR...

Страница 9: ...fo switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP W...

Отзывы: