5) Feed mains supply cable
G
(and second cable
H
for through wiring, if required,
FLC142
ONLY
) through membrane spout(s)
I
(for
diameters 1-9mm), while setting mounting
flange
A
in position.
6) Luminaire is also supplied with accessories to
suit a variety of cable types. Unscrew
membrane sprout(s) I and place packing ring L
(for cable diameters 7-9.5mm) or packing ring
M (for TPS cable), depending on cable type.
Thread cable G through, and screw down
pressure screw N.
7) To fix mounting flange
A
, pierce through nylon
plugs
J
by inserting and tightening screws
D
.
Attention:
Nylon plugs
J
must remain in
position to providesealing.
8) Connect mains supply cable
G
leads to
respective terminals in terminal connector
K
:
a) ON/OFF (L = Phase, N = Neutral,
= Earthing)
b) 1-10 V/DALI (L = Phase, N = Neutral,
= Earthing, DA/DA = DALI control line,
D
–
/D+ = 1-10 V controlline).
4
I
L
M
N
G