background image

Surge Protection

This product features built-in surge protection circuitry in compliance with 

applicable standards.

For comprehensive protection of a luminaire installation against lightning and  

electrical surges, it is essential to cover mains supply and data input lines at  

the distribution board level, by using respective primary (Type 1) and secondary  

(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and activated  

prior to luminaire installation. Also, disconnect luminaires before operating 

high-power devices such as, for example, electrical arc welders.

Do not open during installation

This product is factory-sealed. 

Refer to the instructions contained in this 

document for details.

FFLC131 #2 LEDFLC131 #2 Lffdasfdsfadsfdsafasdfdsafdsafasdfe 

FLC141 #3 LED

FLC131 #2 LED

FLC121 #2 LED

 

Projector

  

Instructions

Installation and Maintenance

WE-EF LEUCHTEN

FLC131 #3 LED

INSTALLER

HOTLINE

+61 458 933 399

7am – 7pm AEST

Содержание FLC121

Страница 1: ...ning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as for example el...

Страница 2: ...1 Projector 60 300 105 FLC121 2 FLC131 2 FLC141 3 80 180 430 Weight kg for FLC121 2 1 7 for FLC131 2 2 5 for FLC141 3 4 4 6 5 10 5 mm 407 for FLC131 3 3 7 FLC131 3 IP66 Class I II ta 40 C...

Страница 3: ...02 8 108 350 400 Planted root ingress related issues landscaped surface and the luminaire is installed directly on the surface warranty is void for any water drainage Otherwise the above mounting acce...

Страница 4: ...cial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out by a suitably quali ed...

Страница 5: ...lling and connecting the luminaire Notice If the luminaire is modi ed by anybody other than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibilit...

Страница 6: ...Drill relevant holes E and insert wall plugs F Warning Ensure not to damage any electrical cable water pipe or other devices while drilling holes 2 Remove mounting ange A by loosening screws B Detach...

Страница 7: ...inal connector C Turn Position luminaire over mounting ange A Ensure that all surfaces are clean and dry 7 ring supplied Then tighten the pressure screw I cable 1 5 to 2 5mm use the auxiliary packing...

Страница 8: ...42 0035 info usa we ef com www we ef com WE EF LEUCHTEN Germany Tel 49 5194 909 0 Fax 49 5194 909 299 info germany we ef com WE EF LUMIERE France Tel 33 4 74 99 14 44 Fax 33 4 74 99 14 40 info france...

Отзывы: