WE-EF ETV100 LED Скачать руководство пользователя страница 6

5

5)  Feed mains supply cable 

C

 (and second cable 

E

 for through wiring) through holes inside 

blockout.

6)  Replace blockout cover prior to luminaire 

installation to prevent tripping hazard/ 

concrete dirt getting into blockout.

7)  Blockout needs to get placed on an even, stable 

DUHD7RSHGJHQHHGVWREHƃXVKZLWKVXUIDFH

 

Attention: 

,IƃRRUZLOOEHWLOHGRUSDYHG

afterwards leave an appropriate gap. In case 

luminaire gets installed at a later time, blockout 

must get covered by installation cover 

A

, to 

make sure no concrete or dirt may enter  

luminaire. Installation cover ensures that 

blockout does not get damaged during masonry 

works and needs to remain inside blockout until 

installation of luminaire.

8)  Framing should be installed to prevent vegeta-

tion from growing over the lens.

Frame

Содержание ETV100 LED

Страница 1: ...ary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire instal...

Страница 2: ...0282 1304 for 3 x ETV120 186 0308 186 0283 1933 for 4 x ETV120 186 0309 186 0284 2562 for 1 x ETV130 ETV130 CC 186 0310 186 0285 975 for 2 x ETV130 ETV130 CC 186 0311 186 0286 1905 for 3 x ETV130 ETV...

Страница 3: ...d Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG DQG WUDLQHG SURIHVVLRQDO Warning D...

Страница 4: ...KH OXPLQDLUH LV PRGL HG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims ba...

Страница 5: ...and or concrete with gravel base Fig I b With fully concreted installation drainage piping must be provided Fig II 3 Test drainage ensure water drains within 30 mins Warning warranty void if luminaire...

Страница 6: ...WR EH XVK ZLWK VXUIDFH Attention I RRU ZLOO EH WLOHG RU SDYHG afterwards leave an appropriate gap In case luminaire gets installed at a later time blockout must get covered by installation cover A to...

Страница 7: ...blockout B 11 Luminaire is pre wired and LED included Opening the luminaire is not necessary Luminaire Installation Procedure 10 Check that rating shown on luminaire label conforms with mains electric...

Страница 8: ...th each sealable junction box G b Cable sheaths must be contained within gel For operation with Tunable White a DALI DT8 controller is required 13 Take sealable junction box G from its bag and open it...

Страница 9: ...n head of screws and spacers Lift spacers in an upwards direction 14 Place sealable junction box G and luminaire H inside blockout Make sure no cable is squeezed Attention For LA10 and A6 ensure corre...

Страница 10: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Страница 11: ...WE EF LEUCHTEN Installation and Maintenance Instructions Wiring instruction for hybrid DMX cable...

Страница 12: ...and maintained by a VXLWDEO TXDOL HG SURIHVVLRQDO LQ FRPSOLDQFH ZLWK ODWHVW building construction and or electrical regulations and relevant legislation 7KH LQVWDOODWLRQ RQ VLWH PXVW FRPSO ZLWK ORFDO...

Страница 13: ...D Neutral N blue Earthing green yellow Phase L brown white shield red white shield green STEAB Paguro IP 68 16A 250V 5650 185 1624 0 6 1kV CE N L N L Luminaire DMX Controller Last luminaire AC End of...

Страница 14: ...RQQHFW OXPLQDLUHpV SRZHU VXSSO FDEOH A and mains supply cable O and second cable F for through ZLULQJ WR WHUPLQDO EORFN H ZLWKLQ MXQFWLRQ ER D L Phase N Neutral Earthing Attention 5HIHU WR DGGLWLRQDO...

Страница 15: ...tie case by cable ties K 6 Connect luminaire s DMX data cables B and external DMX cables E to terminal block I ZLWKLQ MXQFWLRQ box C White DMX Red DMX 6KLHOG 8VH FRUG HQG WHUPLQDOV IRU 0 ZLUHV Attent...

Страница 16: ...necting 120 ohm resistor G placed on each junction box C E DGKHVLYH WDSH EHWZHHQ 0 DQG 0 on terminal block I in junction box C QVXUH FDEOHV GR QRW FURVV DQG WKDW FDEOH VKHDWKV DUH FRQWDLQHG ZLWK JHO 7...

Страница 17: ...G Tel 41 22 752 49 94 Fax 41 22 752 49 74 LQIR VZLW HUODQG ZH HI FRP WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Отзывы: