Phase One 

Blockout Installation Procedure

(during earth or masonry work)

1)  Ensure that proper drainage is provided for the 

shown installation methods.

2)  Ensure a suitable recess is provided to accommo-

date installation blockout/mounting ring assembly 

B/M

.

3)  Test drainage (ensure water drains within 30 mins, 

Warning

: warranty void if luminaire installed with-

out appropriate drainage).

4)  Set installation blockout/mounting ring assembly 

B/M

 in position and ensure that: 

a) Arrow 

R

 on mounting ring 

M

 is pointed towards 

the object to be illuminated (wall, tree, column). 

b) Mounting ring 

M

LVƃXVKZLWKVXUIDFH

F

. If the 

ƃRRUZLOOEHWLOHGRUSDYHGDIWHUZDUGVOHDYHDQ

 

appropriate gap.  

c) Mains supply cable(s) 

O

LVRIVXIƂFLHQWOHQJWKWR

connect sealable junction box 

J

 with cable 

E

 from 

luminaire.

5)  During ongoing earth and/or masonry works, do 

QRWUHPRYHVWLFNHUVRQƂ[LQJWKUHDGKROHV

D

Ensure that installation blockout/mounting ring  

assembly 

B/M

 is not damaged and has maintained 

its original shape. If necessary use a cover plate.

6)  Framing should be installed to prevent vegetation 

from growing over the lens.

Phase Two

Luminaire Installation and Electrical Connection

7)  Switch off mains electrical supply.

8)  Check that rating shown on luminaire label conforms 

with mains electrical supply.

9) Terminate cable 

E

 from luminaire housing 

A

 and 

mains supply cable 

O

 (for individual wiring) or 

branch cable (for through wiring) in sealable junc-

tion box 

J

 – to connect cable(s). Follow the seal-

able junction box termination instruction included 

in the packaging.

10) 

3HHORIIVWLFNHUVRQƂ[LQJWKUHDGKROHV

D

. Set cables 

and sealable junction box 

J

 inside installation 

blockout/mounting ring assembly 

B/M

.

11) Loosen countersunk screws

 C

 (do not turn out).  

Insert mounting lever 

L

 between head of counter-

sunk screws

 C

 and cover lens. Place luminaire 

housing 

A

 into installation blockout/mounting ring 

assembly 

B

/

M

 (Fig. IV) while aligning holes 

D

 on 

mounting ring 

M

.

 

Warning:

 When luminaire is placed inside installa-

tion blockout 

B

, ensure there is no stress on seal-

able junction box 

J

 or electric cables (Fig. lll).

12) Tighten countersunk screws 

'hand-tight'.