
Phase One
Blockout Installation Procedure
(during earth or masonry work)
1) Ensure a suitable recess is provided to accommo-
date installation blockout/mounting ring assembly
L/H
.
2) Set installation blockout/mounting ring assembly
L/H
in position and ensure that:
a)Arrow
R
on mounting ring
H
is pointed towards
the object to be illuminated (wall, tree, column).
b)Mounting ring
H
is flush with surface
F
. If the
floor will be tiled or paved afterwards, leave an
appropriate gap.
c)Mains supply cable(s)
O
is of sufficient length to
connect sealable junction box
J
with cable
N
from
luminaire.
3) During ongoing earth and/or masonry works, do
not remove screws
M
from mounting ring
H.
Ensure that installation blockout/mounting ring
assembly
L/H
is not damaged and has maintained
its original shape. If necessary use a cover plate.
4
Содержание ETC320-GBLED
Страница 2: ......
Страница 3: ...Inground Luminaire IP67 Class I ta 25 C Y 1 X W Fig I...
Страница 8: ...R M J O N O D A B C H F L 6...
Страница 9: ...Fig V G T W E U Fig IV J H M C N L F 7...