Location.

 

 

 

Place  the  pump  as  close  to  the  suction  source  as 
possible. 

 

 

Suction piping should be as short and direct as possible.

 

 

Place the pump below the water level whenever possible. 
This  will facilitate priming, ensures a constant flow of liquid, 
and provides a positive suction.

 

 

Make sure the NPSH (Net Positive Suction Head) is 
accounted for at the suction end of pump relative to  the 
whole  system.  Available  NPSH  must  always  exceed the 
required NPSH specified in the yield curve specifications of 
the pump.

 

 

Always allow sufficient access for maintenance and 
inspection, plus space for the use of a crane strong enough to 
lift the unit.

 

 

Be sure to have an adequate power supply for the pump 
motor.  The electrical characteristics should fall within the 
range specified on the engine data plate.

 

 

Protect the pump from exposure to extremely low 
temperatures to prevent  fluid  inside  the  pump  from  freezing.

 

 

The foundation for a horizontal pump.

 

 

 

To absorb vibrations and prevent misalignment, horizontal 
pumps should be permanently installed on foundations of 
sufficient size, that are made of concrete or steel.

 

 

The foundation may either be on springs or on a raised 
portion of the floor.

 

 

Concrete foundations must be poured without interruption. All 
foundations must be between 3/4 to  1-1/2 inches below the 
elevation of the end pump.

 

 

Anchor bolts should be in their designated positions along the 
pipe sleeves, and be long enough to go through grout, flange, 
nuts, and washers..

 

 

As the foundation needs time to set, the pump should be 
installed several days after the foundation is laid.

 

 

Once the foundation (if concrete) is poured and set, the 

Содержание GE Series

Страница 1: ...Operation Manual GE GU Pumps...

Страница 2: ...here are no missing or damaged pieces from shipping If upon delivery parts are damaged or missing make a claim to the shipping company as soon as possible The design of this product as well as the mat...

Страница 3: ...ts will vary depending on usage and location Improper grounding will void the warranty To reduce the risk of electrical shock always disconnect the pump from the power source before handling or servic...

Страница 4: ...during operation Never apply heat in disassembling a pump as doing so could cause an explosion Do not exceed manufacturer s recommendation for maximum performance as doing so could cause the motor to...

Страница 5: ...ectrical characteristics should fall within the range specified on the engine data plate Protect the pump from exposure to extremely low temperatures to prevent fluid inside the pump from freezing The...

Страница 6: ...place stress on either flange Once the pump is aligned putting on bolt nuts and tightening them will be sufficient to anchor the pump to the steel or concrete foundation Once any grout is completely...

Страница 7: ...ipe to match the diameter of the pump suction as it reaches pump suction opening When required to reduce the pipe diameter use an eccentric reducer with the eccentric side down The pipe should never b...

Страница 8: ...hat avoid air pockets Globe valves should not be used Valves along the suction line should always be fully open when the pump is in operation Pressure gauges may be installed in gauge taps on pump noz...

Страница 9: ...GS Pumps 9 Negative suction installation Diagram Piping Support Foot Valve Strainer Eccentric Reducer Concentric Reducer Shut off Valve Check Valve Elbow Expansion Joint...

Страница 10: ...rge opening for short piping for longer piping size should be 1 or 2 sizes larger according to piping length For best results horizontal piping should have an even gradient 1 Y fitting 2 Tank 3 Shut o...

Страница 11: ...ntenance and pump removal Electrical connections Power and Cables Control The cable assembly mounted to the pump should not be modified in any way except for shortening to a specific application Any s...

Страница 12: ...ve Dry operation will cause seal failure within minutes Clean and flush the suction piping before installing and operating pump Abrasives including pipe scale welding slag and others can rapidly cause...

Страница 13: ...GS Pumps 13 Use the following diagrams as guidance for correct alignment Angular Alignment Parallel Alignment Correct Incorrect...

Страница 14: ...r there to be an ease of installation and convenient control control panel or motor starter s should be placed in close proximity to the pump Incoming power sources should be checked to ensure that th...

Страница 15: ...priming may be accomplished by the use of foot valves or ejectors or by manual filling of the pump casing and suction line Pre start checklist Before starting the pump the following inspections shoul...

Страница 16: ...ded and saved for future reference Motor rotation Before checking motor rotation make sure all components in the system are wired and properly connected If so then check the motor rotation as follows...

Страница 17: ...parameters of the performance curve Check and record Voltage amperage per phase and kilowatts Voltage regulation While the motor will operate satisfactorily under these voltage and frequency variation...

Страница 18: ...y remain filled with liquid Pumps should be primed again fully before restarting Extended period shutdown If the shutdown is for a longer period of time or for pump maintenance close the suction gate...

Страница 19: ...y regular or light loading clean air below 100 F 38 C ambient temperature Severe conditions 24 hours operation shock loading or vibration reduced ventilation ambient temperature between 100 F to 150 F...

Страница 20: ...co Polystar RB Remove grease drain plug if present and the filler plug in order to lubricate greased bearings and then add clean lubricant until it appears at the drain hole or along the shaft For uni...

Страница 21: ...ace the plugs The second oil change occur at 2000 hours of operation The third oil change should occur at 8000 hours of operation From then on oil changes should occur at every 8000 hours of operation...

Страница 22: ...housing on flat surface and press out seal seat 14A To replace the shaft sleeve heat evenly to about 350 F in order to loosen the Loctite and then twist the sleeve off Remove Slinger Remove grease sea...

Страница 23: ...me Replace lip seals if worn or damaged Replace bearings if loose rough or noisy when rotated Check shaft for runout at the sleeve area Below is a chart with the specifications necessary for the ident...

Страница 24: ...aring 10B Front Bearing 11A Back Lip Seal 11B Front Lip Seal 12A Back Snap Ring 12B Front Snap Ring 12C Back Ext Snap Ring 13A Backplate Hex Bolt 13B Casing Hex Bolt 13C Impeller Hex Bolt 14A Backplat...

Страница 25: ...25 GS Pumps GE Parts List...

Страница 26: ...leeve 8A Backplate Gasket 8B Casing Gasket 9A Slinger 12C Ext Snap Ring 13A Backplate Hex Bolt 13B Casing Hex Bolt 13C Impeller Hex Bolt 13D Motor Bracket Hex Bolt 14A Backplate Lock Washer 14B Impell...

Страница 27: ...e and unit will not prime 1 Casing not filled with water 1 Fill pump casing Using a foot valve will extend pump life and facilitate immediate priming 2 Total head too high 2 Shorten suction head 3 Suc...

Страница 28: ...valve strainer or pump 5 Unclog clear or replace as necessary Pump overloads driver 1 Total head lower than pump rating unit delivering too much water 1 Increase back pressure on pump by turning gate...

Страница 29: ...ns carefully 10 Warranty WDM guarantees its GS Pumps for a period of 12 months from the date of delivery against defects in material and workmanship according the indicated in its general conditions o...

Страница 30: ...30 Operation Manual...

Страница 31: ...31 GS Pumps...

Страница 32: ...4034 Mint Way Dallas Texas 75237 Tel 800 783 6756 214 337 8780 support wdmpumps com...

Отзывы: