2
BLOWER KIOSKS INSTALLATION
26
DMS blower kiosk
26
DMC blower kiosk
26
Blower motor size (kW) and power
27
DMS and DMC kiosk installation location
27
DMS kiosk
28
DMC kiosk
28
Connecting tank (DMS/DMC) to the kiosk
29
Hose connections
29
Blower kiosk electrics DMS/DMC
29
Sample chamber installation
30
OPERATION & MAINTENANCE
31
Operation
31
Start up
31
Maintenance
31
Tank de-sludge frequency
31
Determining de-sludging frequency
31
Procedure for de-sludging
32
Approximate de-sludge volumes guide
32
Blower kiosk maintenance
32
Sample Chamber
32
TROUBLESHOOTING
33
DMS and DMC range
33
External Pumping Chamber
35
DMS-EPC Models
35
Installation Considerations
36
Electrical installation
37
Start Up 38
Maintenance
39
Troubleshooting
40
Hints And Tips 41
PROCESS GUARANTEE & WARRANTY
43
Process guarantee
43
Parts covered under the warranty period
43
Warranty limitations/exemptions
43
Chargeable non-warranty work
44
This manual should be retained by the owner for the lifetime of the WPL Diamond plant.
In the event of change of ownership, the manual should be transferred to the new owner.
The owner is responsible for the sewage treatment plant, ensuring that the effluent
quality does not breach applicable discharge consent standards.
Please read this manual thoroughly before commencing with installation, operations
and maintenance.