3
Step 2: Outside Lock Handle Assembly
8000/PR9000 & PR9050 Series doors (see Fig. 4),
align the outside handle assembly with the handle
pointing towards the floor and insert the assembly
through the previously drilled 3/4” diameter holes in
the section. Secure the outside lock handle to the section
with (2) #10 phillips head screws.
9000 Series & Wood doors (see Fig. 5),
align the
outside handle assembly with the handle pointing
towards the floor and insert the assembly through the
previously drilled 3/4” diameter holes in the section.
With the outside lock placed in the section, place the
center lock stile over the shank of the outside lock
handle, secure the center lock stile with foam tape
(8300/
8500 Series & Wood doors will use the lock backup
plate with no foam tape).
Secure the outside lock handle
to the section by placing the (2) #10 phillips head
machine screws through the lock stile into the lock
section.
NOTE: Before proceeding to the next step
its recommended that the outside handle be locked.
Step 3: Inside Handle Assembly
PRE-PUNCHED
HOLES
SHANK
INSIDE
HANDLE
HANDLE
CENTER
STILE
HANDLE
INSIDE
HANDLE
SHANK
Fig. 6
Fig. 7
8000/8100/8200 & 9000 Series doors (see Fig.6),
position the inside handle over the shank of the outside
handle, flush against the center stile. Align the holes in
the handle with the pre-punched holes in the center stile,
then turn the handle clockwise to secure with (2) #8
screws.
8300/8500 Series & Wood doors ( see Fig.7),
position
the inside handle over the shank of the outside handle,
flush against the lock backup plate. Align the holes in
the handle with the pre-punched holes in the lock backup
plate, then turn the handle clockwise to secure with (2)
#8 screws.
NOTE: When securing the inside handle bracket,
be sure not to over tighten the screws or damage to
the inside handle may occur.
NOTE: Follow the Main Installation Instruction
Manual to install the door sections and vertical track
before you install the remainder of the lock parts.
After the sections and track are installed, continue
with Step 4.
BACKUP PLATE
PRE-PUNCHED
HOLES
Fig. 4
Fig. 5
OUTSIDE
HANDLE
3/4” DIA.
HOLES
#10 PHILLIPS
HEAD SCREWS
HANDLE
SHANK
3/4” DIA.
HOLES
OUTSIDE
HANDLE
#10 PHILLIPS
HEAD SCREWS
HANDLE
SHANK
FOAM TAPE
CENTER
STILE
(2) #8 SCREWS
(2) #8 SCREWS