APCD-LM048-1.1
21
4
Installation
4.1 Installation Checklist
A successful installation is divided into pre-installation, installation and post-installation stages,
with each stage outlined in the following checklists.
The Pre-Installation Stage Checklist involves the Network Operator as well as the installer.
Table 3 Pre-Installation Stage Checklist
When everything is ready for the installation stage, then the installer performs the following
steps:
Step
Discussion
The network must be properly configured by the
Network Operator to accept the new modem.
The installer requires some equipment, tools and
information prior to installing the modem.
Ensure that all the needed parts are included.
The end-user’s PC requires an Ethernet Network
Interface to accept the data from the EUM3006.
Содержание EUM3006
Страница 1: ...EUM3006 Integrated Outdoor Modem Installation Guide APCD LM048 1 1...
Страница 5: ...v APCD LM048 1 1...
Страница 9: ...ix APCD LM048 1 1...
Страница 11: ...xi APCD LM048 1 1...
Страница 31: ...14 APCD LM048 1 1 2 MDB1000...
Страница 37: ...20 APCD LM048 1 1 3 Setup Menu...
Страница 59: ...42 APCD LM048 1 1 Appendix B Ethernet Cables and Connectors...
Страница 63: ...46 APCD LM048 1 1 Appendix C Acronyms and Abbreviations...