background image

Need help with y

our ins

tallation

?

Our team is a

vailable fr

om 0900 to 17

00, Monda

y to Frida

y, S

ydne

y time.

Support phone: 

02 8316 7

540

 (+61 2 8316 7

540 from 

overseas

)

Support: T o lodge a Support tick

et, please 

visit our Support P

ortal at 

 

ww

w.w

attw

atchers.

com.au/

support

Support

S0180

19   Quick 

Start Guide 

- A6M

2. Connect your Auditor 

continued

WW

 0

18019   Quick 

Start Guide 

- A6M

 

Size ( amps) 

Opening Width (mm)

60                                           

10

120                                         

16

200                                         

22 

400                                         

25

600

36

Current Transformer Direction 

Install Current Transformers (CTs) such that: 

 

•  For grid monitoring: arrow is from grid
•  For solar monitoring: arrow is from inverter
•  For load monitoring: arrow is towards the load. 

About the split-core CTs:

•  Only Wattwatchers-supplied CTs are supported

• All CTs can be interchanged in the field (in sets of 3)
•  Different-sized CTs can be used on one device, in sets of three

 

eg. channels 1-3, 60 Amps; channels 4-6, 400 Amps

•   CT sizes can be changed using the onboarding tool in step 3

• Directional arrows for CT placement are imprinted on the CTs.

CT sizes and opening aperture widths

Содержание Auditor 6W

Страница 1: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Страница 2: ...For load monitoring arrow is towards the load The CT connections are labelled 6 5 4 3 2 1 The white wires connect to terminals labelled three wires in each terminal The pink wires connect to the termi...

Страница 3: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Страница 4: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Страница 5: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Страница 6: ...400 25 600 36 Current Transformer Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is...

Страница 7: ...white wires connect to terminals labelled three wires in each terminal The pink wires connect to the terminals labelled The CTs and Voltage phases must match as stated below Place CT connected to On...

Страница 8: ...unicate over the internet using the household WiFi the network name and password is required This allows the Wattwatchers energy device to send and receive data over the homeowner s internet link Any...

Страница 9: ...T size Log into the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s n...

Страница 10: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Страница 11: ...s ve and expected value on all circuits Grid and load CTs are installed correctly Ensure CT phase and orientation are correct CTs on the wrong phase may cause negative PF readings Where there is solar...

Страница 12: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Страница 13: ...the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s network open a w...

Страница 14: ...ees 400 25 600 36 CT Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is towards the lo...

Отзывы: