background image

Page 1

 

 

 
 
 
 

 

 

 

 

 
 
 

 
 

 

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Refer to enclosed warranty and operating parameters to ensure proper use with your water supply.

Save manual for future reference

SERIES

WQC4 RO

Warning

Please read carefully before proceeding with installation.  Your failure to follow the instructions or 

operating parameters may lead to the product’s failure and possible damage to property.

 

        Manual Edition: 4/12/07

DISTRIBUTED BY:

Содержание WQC4 RO SERIES

Страница 1: ...proper use with your water supply Save manual for future reference SERIES WQC4 RO Warning Please read carefully before proceeding with installation Your failure to follow the instructions or operating...

Страница 2: ...Carbon filter recommended change 6 months The second stage contains a carbon block filter This helps ensure that chlorine and other materials that cause bad taste and odor are greatly reduced Stage 3...

Страница 3: ...for the Faucet in a Stainless Steel Sink 5 Faucet Installation 6 Adapta Valve Installation 7 Reverse Osmosis Module Mounting 7 Air Gap Non Air Gap Installation 8 Drain Saddle Installation 9 Tank Valve...

Страница 4: ...if copper tubing is down stream of the RO Be sure to follow any state or local regulations Operational Parameters Note The operating pressure in your home should be tested over a 24 hour period to at...

Страница 5: ...l or liquid soap to keep the hole saw cool during cutting Step 2 Drill a Hole for the Faucet in a Porcelain Sink Punch a Hole for the Faucet in a Stainless Steel Sink Drill a pilot hole Use a 1 2 Hole...

Страница 6: ...llips head screwdriver turn the screw clockwise until the toggle bolt secures the faucet base snug onto the sink top do not over torque toggle bolt 5lb in max Once the faucet base is securely fastened...

Страница 7: ...above choosing the configuration that fits your plumbing When attaching the adapta valve to straight pipe threads use Teflon tape on the threads The white tube from inlet side of RO module will be cut...

Страница 8: ...Page 8 Non Air Gap Faucet Installation Air Gap Faucet Installation...

Страница 9: ...this time The black tubing will be installed later The small square black foam gasket with a circle cut out of the middle must be applied to the inside of the drain saddle Remove sticky tape backing...

Страница 10: ...Step 21 Step 20 Adapta Valve Remove a brass nut plastic sleeve and brass insert from the parts bag Place nut on the tube first then the sleeve Small taper end of sleeve must point to the end of tube...

Страница 11: ...dle to allow for proper drainage Step 24 Note Note Step 23 How To Use the Quick Connect Fittings on the RO Module To make a connection the tube is simply pushed into the fitting It is essential that t...

Страница 12: ...tank 3 times is only necessary during initial installation This should take about a day to complete Open the RO faucet and leave it open until water begins to trickle out it will come out slowly Step...

Страница 13: ...the cartridge to the vertical position Step 7 The Sediment cartridge and pre carbon cartridge should be changed every six months Step 2 Cartridge replacement is made easy with the Watts Kwik Change sy...

Страница 14: ...he faucet and allow the tank to empty and then close the faucet Replace the post carbon filter cartridge Annual Maintenance Storage Tank Sanitization Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 S...

Страница 15: ...on Use If the system will not be used for an extended period more than 2 months perform the following Turn on the water supply at the adapta valve Step 1 Step 2 Step 3 Step 4 Step 5 Turn off the incom...

Страница 16: ...15 4 Noise from faucet or drain Air gap faucet Inherent sound with air gap faucets Location of drain saddle See diagram for proper location of drain saddle Higher capacity membrane Normal with high c...

Страница 17: ...Purchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6 months 4th stage Carbon 1 year 3rd...

Страница 18: ...2 The hardness of the water should not exceed 10 grains per gallon or 170 ppm 3 Maximum incoming iron must be less than 0 2 ppm 4 The pH of the water must not be lower than 2 or higher than 11 5 The i...

Страница 19: ...10 11 13 MEMBRANE FILTER 50 OR 100 GPD 4 1 WQGAC 10 11 13 POST CARBON FILTER 5 1 FRO 132 WH 4 GALLON WHITE STEEL TANK 6 1 ROPRO4 W RO ROPRO STORAGE TANK WHITE PLASITC 7 1 BV9014W 3 8 FEMALE ELBOW SHU...

Страница 20: ...Page 20...

Отзывы: