Watts Tekmar 305V Скачать руководство пользователя страница 5

5 of 12

Application 305V-2

Mechanical

Electrical

The Zone Valve Control 305V operates a four heating zones and a domestic hot water tank. When a thermostat calls 
for heat, the zone valve opens and the system pump and the boiler turn on once the zone valve end switch closes. The 
domestic hot water tank is heated using a pump. When priority is selected, the heating zones are shut off while the 
hot water tank is heated.

Legend

A1 = DHW Tank Aquastat
B1 = Modulating Condensing Boiler
BP = Boiler Pump
PS = System Pump
P1 = Zone 1 DHW Tank Pump
T1 = WiFi Thermostat 561, 562 or 563

I n c l u d e d 510 Ω 
resistor must be 
i n s t a l l e d   w h e n 
u s i n g   p o w e r 
stealing thermostats 
(e.g. Thermostat T3)

End switch jumper required 
for Zone 1 when using a 
pump and Zone Valve End 
Switch DIP = On

L

N

Power

L

N

System

Pump

L

N

B1

PS

P1

V1

V2

V3

V4

A1

BP

305V

T2 = Thermostat 518 or 519
T3 = Generic Digital Power-Stealing Thermostat
T4 = Generic Bi-Metallic Strip Thermostat
V1 = 2-Wire Zone Valve
V2 = 3-Wire Zone Valves (e.g. Taco 570)
V3, V4 = 4-Wire Zone Valve

Away

C R Rh W

Away

C R Rh W

R W

R W

MOD

X X

tN4

T1

T2

T3

T4

T5

T6

A

DHW

C R W

BOILER

T-STAT 1

T-STAT 2

T-STAT 3

-

+

tN4

A C R W

tN4

A C R W

T-STAT 4

tN4

A C R W

T-STAT 5

tN4

A C R W

T-STAT 6

EXPANSION

tN4

A C R W

tN4

A B C D E

FUSE 2 FUSE 1

END

SWITCH

MOTOR

POWER

PRIORITY

SYS PUMP

ROOM

RESPONSE

ZONE 1

70 80

90

60

50

100

MOD MAX %

END

SWITCH

MOTOR

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

MASTER

MEMBER

OFF

OFF

OFF

T-STAT 1 PRIORITY : ON

EXERCISING : ON

POST PURGE : ON

MOD BOILER : 0-10V

SYSTEM PUMP DURING PRIORITY: ON

SYSTEM PUMP WITH MEMBER CALL: ON

ZONE VALVE END SWITCHES: ON

RESERVED

120 VAC

POWER

PUMP

PUMP 1

SYSTEM

PRIORITY

L

N

L

N

L

N

OFF

OFF

OFF

4-20 mA

1 2 3

+

T-T

DHW

-

B1

A1

T1

P1

L N

PS

V1

V2

V3

V4

T2

T3

T4

DIP Switches

Master
T-stat 1 Priority On
Exercising On
Post Purge On
Mod Boiler - depends on boiler
System Pump During Priority Off
System Pump With Member Calls Off
Zone Valve End Switches On

Содержание Tekmar 305V

Страница 1: ...rculator and zone valves to provide heating to a zoned hydronic heating system RoomResponseTM signal Compatible with all low voltage thermostats Unlimited zone expansion Zone priority Priority override Pump exercising Post purge Away signal shared between tekmar thermostats Features LED for each zone priority end switch and RoomResponseTM Four ground screws Top bottom and back conduit knockouts Fu...

Страница 2: ... if not avoided could result in minor or moderate injury This symbol identifies practices actions or failure to act which could result in property damage or damage to the equipment Read manual and all product labels BEFORE using the equipment Do not use unless you know the safe and proper operation of this equipment Keep this manual available for easy access by all users Replacement manuals are av...

Страница 3: ...Needle nose pliers Wire stripper 18 AWG LVT solid wire low voltage connections 14 AWG solid wire line voltage connections Four 1 8 1 wood screws 1 Zone Valve Control 305V 2 Spare fuses located in cover Installation Manual 305V_D Keep the control dry Avoid potential leakage onto the control Maintain relative humidity less than 90 in a non condensing environment Avoid exposure to extreme temperature...

Страница 4: ... a lle d whe n u s i n g p o w e r stealing thermostats e g Thermostat T4 N B1 PS 305V V1 V2 V3 V4 V5 Away C R Rh W Away C R Rh W Away C R Rh W R W R W MOD X X tN4 T1 T2 T3 T4 T5 T6 A DHW C R W BOILER T STAT 1 T STAT 2 T STAT 3 tN4 A C R W tN4 A C R W T STAT 4 tN4 A C R W T STAT 5 tN4 A C R W T STAT 6 EXPANSION tN4 A C R W tN4 A B C D E FUSE 2 FUSE 1 END SWITCH MOTOR POWER PRIORITY SYSPUMP ROOM RE...

Страница 5: ...tealing Thermostat T4 Generic Bi Metallic Strip Thermostat V1 2 Wire Zone Valve V2 3 Wire Zone Valves e g Taco 570 V3 V4 4 Wire Zone Valve Away C R Rh W Away C R Rh W R W R W MOD X X tN4 T1 T2 T3 T4 T5 T6 A DHW C R W BOILER T STAT 1 T STAT 2 T STAT 3 tN4 A C R W tN4 A C R W T STAT 4 tN4 A C R W T STAT 5 tN4 A C R W T STAT 6 EXPANSION tN4 A C R W tN4 A B C D E FUSE 2 FUSE 1 END SWITCH MOTOR POWER P...

Страница 6: ...way C R Rh W Away C R Rh W T T Away C R Rh W MOD X X tN4 T1 T2 T3 T4 T5 T6 A DHW C R W BOILER T STAT 1 T STAT 2 T STAT 3 tN4 A C R W tN4 A C R W T STAT 4 tN4 A C R W T STAT 5 tN4 A C R W T STAT 6 EXPANSION tN4 A C R W tN4 A B C D E FUSE 2 FUSE 1 END SWITCH MOTOR POWER PRIORITY SYSPUMP ROOM RESPONSE ZONE 1 70 80 90 60 50 100 MOD MAX END SWITCH MOTOR ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR Z...

Страница 7: ...the boiler If using a single Switching Relay set to Master When using multiple Switching Relays and or Zone Valve Controls set one control to Master and set all other controls to Member The boiler end switch XX only closes when the DIP switch is set to Master and does not close when set to Member T Stat 1 Priority DIP Switch When T Stat 1 is calling for heat by closing the R and W terminals 115 V ...

Страница 8: ...tration Boiler Make Model Required Adapter Supplied by boiler manufacturer 0 10 V dc 4 20 mA DIP Switch Mod Max Dial for Boiler Design Temperature 120 F 140 F 160 F 180 F Aerco AM series Not required 0 10 V 50 65 80 100 Bosch Greenstar ICM Module 0 10 V 55 70 80 100 Buderus GB142 GB162 EM10 Module 0 10 V 50 60 75 90 Burnham Alpine Not required 4 20 mA 50 70 85 100 Camus Modulating Micoflame Not re...

Страница 9: ... Change Energy Management setting Central Heat Modulation Source to 4 20 mA Change Energy Management setting Central Heat 4 20 mA Setup 4 mA Water Temperature to 80 F 26 5 C 9 10 22 23 5 6 16 17 2 U 1 X X T T 1 2 9 10 No changes to the boiler are required On the V10 controller Set Load 1 to External Control Change Max Control 9 5 Vdc to 190 F 88 C Change Min Control 2 1 Vdc to 32 F 0 C IBC V10 Con...

Страница 10: ...etpoint source to 4 20mA Enter boiler password Set Parameter Setpoint source to 4 20mA Lochinvar Knight Lochinvar FTXL NTI Trinity LX Riverside HeatStation NTI Trinity Fire Tube 305V 305V 305V 305V 305V Sensor I O 24Vac I O X X W R 1 2 37 38 X X W R 21 22 35 36 X X CH1 R 3 5 11 12 X X CH1 R 3 5 4 5 8 EMS 9 Laars Mascot FT Peerless Pinnacle Terminal Strip Peerless Pinnacle Control Board Peerless PF...

Страница 11: ... 305V 305V 1 4 1 2 5 6 Connect to the Viessmann Extension Module EA1 Plug 0 10V Zone Valve Control 305V Five Zones with Priority Literature Submittal 305V_C Installation Manual 305V_D Job Record 305V_J Packaged weight 6 0 lb 2750 g Dimensions 8 3 16 H x 10 11 16 W x 2 3 8 D 208 x 271 x 60 mm Enclosure Cover ABS plastic Base galvanized steel NEMA type 1 Approvals CSA C US RoHS Ambient conditions In...

Страница 12: ... made by Pur chaser to its customers which are different from or in excess of the tekmar Limited Warranty are the Purchaser s sole responsibility and obligation Purchaser shall indemnify and hold tekmar harmless from and against any and all claims liabilities and damages of any kind or nature which arise out of or are related to any such representations or warranties by Purchaser to its customers ...

Отзывы: