8
Lamp and Quartz Sleeve Replacement Procedure
1. Disconnect the power supply from the wall outlet.
2. Turn off the inlet valve and outlet isolation valves.
3. Loosen the Phillips set screw on the quartz sleeve nut and
separate the nut into its two halves by pulling on the back
half of the nut.
4. Carefully withdraw lamp approximately 2 inches from cham-
ber and disconnect the lamp lead wire from lamp. Remove
the lamp from the UV chamber. If not replacing the quartz
sleeve proceed to step 11.
5. De-pressurize the system.
6. Grip the quartz sleeve nut with your hand and unscrew coun-
ter clockwise until it can be disconnected from the reactor
chamber's threaded port.
7. Remove the quartz sleeve from the reactor chamber.
8. Fully insert a new quartz sleeve into the reactor chamber. Be
careful not to force the quartz sleeve, breakage may occur.
Then install the o-ring over the quartz sleeve.
9. Install the quartz sleeve nut onto the threaded port of the
reactor chamber. Screw the quartz sleeve nut on clockwise
and tighten hand tight.
10. Turn on the inlet valve and check for leaks. Repair leaks as
needed.
11. Insert a new lamp into the quartz sleeve.
12. Reconnect the lamp lead wire to the new lamp and press
the chamber nut’s two halves back together. Then tighten
the Phillips set screw.
13. Restore power to the system.
14. Verify LED Indicator is green.
Immediately after replacement of the UV lamp, and/or quartz
sleeve, follow the disinfection procedure within this manual.
If any water comes in contact with any electri-
cal components, dry the components immedi-
ately.
DO NOT
energize a system with damp
or wet electrical components.
WARNING
!
120 Volt Lamp Connection
230 volt Lamp Connection
Содержание Pure Water SmartStream UV PWA002
Страница 6: ...6 Typical Installation Diagram ...