Watts LFM513-6 Скачать руководство пользователя страница 7

Valve Disassembly Instructions

 

Before undertaking valve disassembly, it is recommended to gather the following tools to aid you during the process:
• Small & large adjustable wrenches
• Screwdriver set
• Machinist fine metal file
• Fine wire brush
• Bench vise
• Basic valve IO&M manual
• Hammer & dull cold chisel
• Heavy-duty ratchet & socket set
• Hexagonal wrench set
• 320 grit/fine Emery cloth
•  Appropriate technical bulletins for  

valve start-up procedures.

1.  Isolate the valve from line pressure and depressurize it to ensure safe working conditions. Disconnect any electrical  

connections if so equipped.

2.  Carefully remove Position Indicator or Limit Switches if equipped. Remove all tubing, fittings, and Control Pilots  

necessary to easily access and remove the cover. Remove cover nuts and washers.  

3.  Remove the cover. If cover is not free to be removed, loosen it by tapping upward along its outside edge with a dull cold chisel, pic-

tured above.  

a.  Large valves may require the installation of lifting “eye” bolts in order to facilitate cover removal; installation ports are provided on 

the cover for this purpose.

4.  Remove the Disc and Diaphragm Assembly from the valve body by lifting straight up. 

a.  Large diameter valves may require a lifting “eye” bolt to be installed in the valve stem accessory threads located on the very  

top of the valve stem.

5.  Before removing Stem Nut, examine stem threads for mineral build-up. Remove deposits with a fine wire brush. Extreme care should 

be taken not to damage the finish on stem guiding surfaces when disassembling. Avoid applying pipe wrenches to top or bottom 

stem guide surfaces.

VALVE COVER

BRASS BAR STOCK
(ANGLE UPWARD)

HAMMER

6          IOM-ACV-513-6_6513-6 2115 

EDP# 1917101 

© 2021 Watts

IOM-ACV-513-6_6513-6 2115 

EDP# 1917101 

© 2021 Watts         7

Содержание LFM513-6

Страница 1: ...rol 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the information provided You are required to consult the local building and plumbing codes prior to installation If the information provided here is not consistent with local building or plumbing codes the local codes should be follo...

Страница 2: ...ime must be allowed for the valve to react to adjustments and the system to stabilize The objective is to bring the valve into service in a controlled manner to protect the system from damaging over pressure Operation The Deep Well Pump Control Valve is designed to minimize the surges associated with the starting and stopping of well pumps The valve slowly opens and closes as required to control p...

Страница 3: ...ovement and remove excess air trapped within the cover chambers See Figure 1 Below To increase the rate of opening closing turn the adjustment screws on the speed controls OUT counterclockwise In decrease the rate of opening closing turn the adjustment screws on the speed controls IN clockwise STEP 2 Prior to pump start energize the solenoid to confirm connection to power source STEP 3 De energize...

Страница 4: ...ment located on the upper chamber While free flow goes into the lower chamber the Opening speed flow control restricts flow out of the upper cham ber of the main valve If valve opening is too slow turn the adjustment screw OUT counterclockwise increasing the rate of opening If valve opening is too quick turn the adjustment screw IN clock wise decreasing the rate of opening STEP 5 STEP 8 At valve f...

Страница 5: ...e specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm or tighten disc diaphragm assembly Test 2 Seat Seal Test 1 Close downstream isolation valve and install pressure gauges on an open inlet and outlet port of main valve 2 Open upstream isolation valv...

Страница 6: ...n Valve will not close Closed isolation valves in pilot system Check isolation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blockage in main valve Perform freedom of movement test if valve does not close disassemble and remove blockage Worn damaged valve...

Страница 7: ... Remove cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require the installation of lifting eye bolts in order to facilitate cover removal installation ports are provided on the cover for this purpose 4 Remove the Disc and Diaphragm Assembly from the valve body...

Страница 8: ... deposits and inspect for excessive wear Remove any mineral build up from other components with wire brush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary If it is damaged please contact factory for instructions 8 IOM ACV 513 6_6513 6 2115 EDP 1917101 2021 Watts ...

Страница 9: ...ly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by following the Seat Seal Test procedure in previous section 12 Return valve to service by following instructions on the Technical Bulletin matching the valve function Size in 2 21 2 3 4 6 8 10 12 14 16 P N 0677 21 0677 22 0677 23 0677 24 0677 25 0677 26 Consult Fact...

Страница 10: ...3 and Smaller ASTM A276 302 Stainless Steel 13A Bearing Retaining Ring 4 and Larger ASTM A276 302 Stainless Steel 14 Inner Bearing ASTM A276 304 Stainless Steel 15 O ring Buna N Nitrile 16 O ring Buna N Nitrile 17 Upper Stem ASTM A276 304 Stainless Steel 18 Lower Stem ASTM A276 304 Stainless Steel 19 Spring ASTM A276 302 Stainless Steel 20 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron...

Страница 11: ...IOM ACV 513 6_6513 6 2115 EDP 1917101 2021 Watts 11 NOTES ...

Страница 12: ...ot be responsible for any incidental special or consequential damages including without limitation lost profits or the cost of repairing or replacing other property which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances ov...

Отзывы: