background image

SETTING THE SURGE CONTROL 

Note: Surge Control is set at a higher PSI than the 

Pressure Reducing Control.

STEP 4

Open downstream isolation valve partially to establish flow 

through the valve, observing downstream pressure change. In-

crease of pressure should stop below the desired surge pressure 

setting.

STEP 5

Gradually open downstream isolation valve until full open.

SETTING THE PRESSURE REDUCING CONTROL

STEP 1

Adjust the Pressure Reducing Control to the desired pressure set 

point by turning the adjustment screw OUT, counterclockwise 

until downstream pressure decreases to the desired setpoint (See 

Figure 3).

STEP 6

Adjust the Surge Control by turning the adjustment screw IN, 

clockwise, to increase, or OUT, counterclockwise, to decrease, 

the downstream pressure surge set-point (See Figure 2).

Counterclockwise to DECREASE 

downstream pressure

Clockwise to INCREASE-

downstream pressure

Figure 3 

CP15 — Pressure Reducing Control

Clockwise to INCREASE 

downstream pressure surge 

set-point

Counterclockwise to DECREASE 

downstream pressure surge set-

point

Figure 2 

PV20C — Surge Control

4          IOM-ACV-115-43_6115-43   2115 

EDP# 1917037 

© 2021 Watts

IOM-ACV-115-43_6115-43   2115 

EDP# 1917037 

© 2021 Watts         5

Содержание LFM115-43

Страница 1: ...tion 2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the information provided You are required to consult the local building and plumbing codes prior to installation If the information provided here is not consistent with local building or plumb...

Страница 2: ...y valves ensure valve disc does not contact the main valve 6 Provide adequate clearance for valve servicing and maintenance Refer to valve servicing dimensions on next page 7 Avoid installing valves 6 and larger in the vertical position main valve stem horizontal Automatic Control Valves ACVs are designed for horizontal in line installation with the cover facing up main valve stem vertical Slow op...

Страница 3: ... 14 16 24 26 28 30 34 40 48 48 Size in 11 4 11 2 2 21 2 3 4 6 8 10 12 14 16 C in 16 16 20 22 22 24 32 34 38 44 48 52 D in 10 10 12 14 14 16 24 26 28 30 34 40 STEP 2 To ensure proper operation any trapped air will need to be bled off the valve cover during startup If your ACV includes a bleed valve use a flat head screwdriver to slowly open the valve See Figure 1 If your valve does not include a bl...

Страница 4: ...ed pressure set point by turning the adjustment screw OUT counterclockwise until downstream pressure decreases to the desired setpoint See Figure 3 STEP 6 Adjust the Surge Control by turning the adjustment screw IN clockwise to increase or OUT counterclockwise to decrease the downstream pressure surge set point See Figure 2 Counterclockwise to DECREASE downstream pressure Clockwise to INCREASE dow...

Страница 5: ...kwise increasing the rate of closing Setting the Pressure Sustaining Control Step 1 Setting The Relief Sustaining Control requires lowering the upstream pressure to the desired minimum sustained pressure STEP 2 Leave the downstream isolation valve fully open and close the upstream isolation valve until the inlet pressure drops to the desired setting STEP 3 Adjust the Relief Sustaining Control scre...

Страница 6: ... specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm or tighten disc diaphragm assembly Test 2 Seat Seal Test 1 Close downstream isolation valve and install pressure gauges on an open inlet and outlet port of main valve 2 Open upstream isolation valve...

Страница 7: ...bly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for opening speed control is 11 2 21 2 turns open from full closed position Can be adjusted in field Main Valve will not close Closed isolation valves in pilot system Check isolation valves ensure open Di...

Страница 8: ...Remove cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require the installation of lifting eye bolts in order to facilitate cover removal installation ports are provided on the cover for this purpose 4 Remove the Disc and Diaphragm Assembly from the valve body ...

Страница 9: ...brush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are threaded into the body of the valve and require a seat removal tool Figure 6 Table 1 details the tool dimensions for seat removal Valve seats 8 and larger are held in the valve body with stainless steel ca...

Страница 10: ...Nuts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by following the Seat Seal Test procedure in previous section 12 Return valve to service by following instructions on the Technical Bulletin matching the valve function Size in 11...

Страница 11: ...eel 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spacer Washer x5 NY300 Fiber 15 Disc Guide ASTM A743 CF8M 316 Stainless Steel 16 Shaft ASTM A276 304 Stainless Steel 17 Seat Ring ASTM A743 CF8M 316 Stainless Steel 1...

Страница 12: ...not be responsible for any incidental special or consequential damages including without limitation lost profits or the cost of repairing or replacing other property which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances o...

Отзывы: