background image

Page 10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Start up Instructions

If you have connected your RO system to a refrigerator / ice maker, make sure the ice maker 

is off (do not allow water to flow to the ice maker) until flushing (Step 4) is complete and the 

tank has been allowed to fill completely. Connection from the RO to the ice maker system 

should have an in-line valve installed before the ice maker so it can easily be closed to prevent 

water flowing to the ice maker during start up and periodic maintenance. Your RO tank must 

be allowed to fill up fully in order for the ice maker system to work properly. 

After the Tank has filled, open the RO Faucet to flush the tank completely. You will know that 

the tank is empty when the flow rate from the RO faucet is down to a trickle.  Repeat this step 

two more times.  The fourth tank can be used for drinking. 

Open  the  RO  faucet  and  leave  it  open  until  water  begins  to  trickle  out  (it  will  come  out 

slowly).

Step 4

Turn on the incoming cold water at the angle stop valve.  Open the needle valve on the brass 

Adapt-a-Valve by turning counter clockwise. Check the system for leaks and tighten any fittings 

as necessary.   (Check frequently over the next 24 hours to ensure no leaks are present).

Step 3

Step 2

Note:

Step 1

Close the RO faucet allowing the storage tank to fill with water.

  It may take 3 to 6 hours to 

fill the tank completely depending on the production capability of the membrane, local water 

temperature and water pressure. 

Flushing of the tank 3 times is only necessary during the initial startup and after replacing the 

membrane.

During the fill period you may hear water trickling due to the Reverse Osmosis Process.

Note:

Note:

Congratulations!

You have completed the installation of new your Reverse Osmosis system.

Please Follow the Startup Instructions.

The flushing process should take about a day to complete. 

Содержание GTS450S

Страница 1: ...instructions or operating parameters may lead to the product s failure Refer to enclosed warranty for operating parameters to ensure proper use with your water supply Watts 2010 M WQP GTS 1041 INSTALL...

Страница 2: ...at traps sediment and other particulate matter like dirt silt and rust which affect the taste and appearance of your water Stage 2 and 3 Carbon filters recommended change 6 months Stage 3 Only on the...

Страница 3: ...a Hole for the Faucet in a Stainless Steel Sink 6 Adapt a Valve Installation 6 Typical RO Faucet Installation 7 Drain Saddle Installation 8 System Drain Connection 8 Green Tube Connection Feed Water 9...

Страница 4: ...37 8 C Minimum 40 F 4 4 C Operating Pressure Maximum 85 psi 6 0 kg cm2 Minimum 40 psi 2 80 kg cm2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity...

Страница 5: ...the fitting to the tube stop The collet gripper has stainless steel teeth which hold the tube firmly in position while the O ring provides a permanent leak proof seal Pull on the tube to check that i...

Страница 6: ...nd an adjustable wrench to punch the hole in the sink Step 5 If mounting faucet to a Stainless Steel Sink you will need a Hole Punch The faucet opening should be centered between the back splash and t...

Страница 7: ...using Attached to the polishing filter is a 3 8 quick connect elbow fitting Attach the open end of the 3 8 blue tubing from the RO faucet to the 3 8 quick connect elbow on the polishing filter With No...

Страница 8: ...the drain saddle kit Insert the red tube into the opening in the drain saddle and hand tighten the black nut and add 1 4 turn with a wrench The 3 8 drain tube must be as SHORT and STRAIGHT as possibl...

Страница 9: ...on top of the tank Tank Valve Installation Metal Tank Tank Valve Installation Plastic Tank Thread the plastic valve onto the tank fitting Do not over tighten or the valve could crack Step 1 Step 2 Mak...

Страница 10: ...king Open the RO faucet and leave it open until water begins to trickle out it will come out slowly Step 4 Turn on the incoming cold water at the angle stop valve Open the needle valve on the brass Ad...

Страница 11: ...k O rings and lubricate with water soluble lubricant KY Jelly or other water based lubricants may be used Petroleum based lubricants such as Vaseline must not be used Step 5 Before re installing the f...

Страница 12: ...turning the adapt a valve clockwise until it stops Keep the RO faucet open until the storage tank is completely drained Open the membrane housing and re install the RO membrane while making sure not t...

Страница 13: ...he needle valve on the adapt a valve clockwise until it stops Open the RO Faucet and allow water to drain from the tank until it is completely empty Step 2 Removing the membrane Installing the membran...

Страница 14: ...an be added with a bicycle pump using the schrader valve that is located on the lower side of the tank behind the blue plastic cap Tip When water from the RO faucet slows to a trickle with the faucet...

Страница 15: ...pty tank pressure should be 5 7 psi See page 14 4 Noise Water from faucet Crimp or restriction Check tubing and straighten or repair as necessary vent hole or noise from in drain line Straighten all d...

Страница 16: ...Page 16 5 Stage Reverse Osmosis System Third Filter Bowl on GTS550S System Only...

Страница 17: ...emperature Maximum 100 F 40 5 C Minimum 40 4 4 3 Operating Water Pressure Maximum 100 psi 7 0kg cm2 Minimum 40 psi 2 8kg cm2 4 pH 2 to 11 5 Maximum iron present in incoming feed water supply must be l...

Страница 18: ...senic to pentavalent arsenic Other water treatment chemicals such as ozone and potassium permanganate will also change trivalent arsenic to pentavalent arsenic A combined chlorine residual also called...

Страница 19: ...urchase __________ Date of Install ___________ Installed by __________________ NOTES Date 1st stage Sediment 6 months 2 nd stage Carbon 6 months 3rd stage Carbon 6 months W500S Only Final Filter Carbo...

Страница 20: ...ng water pressure must be between 40 and 85 pounds per square inch 6 Incoming water to the RO cannot exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do...

Отзывы: