manualshive.com logo in svg
background image

 

5

 

ES-A-ACV-LF985GD  2115 

© 2021 Watts

Basic Valve 

Installation: If unit is installed in any orientation other than 

horizontal (cover up) OR extreme space constraints exist, 

consult customer service prior to or at the time of order. 

NOTICE

8

9

10

10

12

13A

13

14

15

16

17

18

19

20

21

22

23

24

24A

25

11

1

2

3

4

5

6

7

ITEM

DESCRIPTION

MATERIAL

1

Pipe Plug

Lead Free Brass

2

Cover

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

3

Cover Bearing

ASTM A276 304 Stainless Steel

4

Stud with Cover Nut and Washer

ASTM A570 Gr.33 Zinc Plated Steel

5

Upper Body

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

6

Gasket Seal

Buna-N (Nitrile)

7

Body

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

8

Stem Nut

ASTM A276 304 Stainless Steel

9

Lock Washer

ASTM A276 302 Stainless Steel

10

Diaphragm Washer

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

11

Diaphragm *

Buna-N (Nitrile)

12

Inner Bearing Bolts** (3" and Smaller)

ASTM A276 304 Stainless Steel

13

Inner Bearing Retainer**  (3" and Smaller)

ASTM A276 302 Stainless Steel

13A

Bearing Retaining Ring** (4" and Larger)

ASTM A276 302 Stainless Steel

14

Inner Bearing

ASTM A276 304 Stainless Steel

15

O-ring *

Buna-N (Nitrile)

16

O-ring *

Buna-N (Nitrile)

17

Stem

ASTM A276 304 Stainless Steel

18

Disc Retainer

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

19

Spacer Washer *

NY300 Fiber

20

Disc *

Buna-N (Nitrile)

21

Disc Guide

ASTM A743 CF8M (316) Stainless Steel

22

Lock Washer

ASTM A276 304 Stainless Steel

23

Stem Nut

ASTM A276 304 Stainless Steel

24

Seat Ring***

ASTM A743 CF8M (316) Stainless Steel

24A

Seat Screw*** (8" and Larger)

ASTM A276 304 Stainless Steel

25

Seat Gasket *

Buna-N (Nitrile)

* Contained in Main Valve Repair Kit

**4 inch and larger valves do not require Bearing Bolts

***Note: 6 inch and smaller valves, Seat Ring is threaded

8

9

10

10

12

13A

13

14

15

16

17

18

19

20

21

22

23

24

24A

25

11

1

2

3

4

5

6

7

ACV Schematic - Series LF985GD 

Содержание AMES LF985GD Series

Страница 1: ...al codes and ordinances WARNING Need for Periodic Inspection Maintenance This product must be tested periodically in compliance with local codes but at least once per year or more as service condition...

Страница 2: ...e pump starts and stops against an open valve Pump start up When the pump is signaled to start the 4 Way Solenoid is energized and directs fluid and pressure into the cover chamber above the diaphragm...

Страница 3: ...ly This assembly is the only moving part within the valve allowing it to open or close as commanded by the pilot control system When pressure is applied to the upper diaphragm chamber and released fro...

Страница 4: ...ure Drop psi 2 3 4 6 8 10 20 30 40 60 80 100 Flow Rate Gallons per minute Water 2 4 10 20 40 60 80 100 200 500 1000 2000 5000 10000 20000 100000 8 6 1 4 1 6 1 2 1 0 8 6 4 3 2 1 2 2 1 2 1 0 8 6 4 3 2 1...

Страница 5: ...e Iron 11 Diaphragm Buna N Nitrile 12 Inner Bearing Bolts 3 and Smaller ASTM A276 304 Stainless Steel 13 Inner Bearing Retainer 3 and Smaller ASTM A276 302 Stainless Steel 13A Bearing Retaining Ring 4...

Страница 6: ...nter Angle Thread Angle 150 Angle 300 Angle Thread Angle 150 Angle 300 Port Size NPT Port Size NPT Port Size NPT Shipping Weights A B C D E F G H I J K L M in in mm in mm in mm in mm in mm in mm in mm...

Страница 7: ...EPDM optional Viton optional Voltage 24VDC 24VAC or 120VAC Enclosure General Purpose NEMA 4 standard Explosion Proof NEMA 6 6P 7 9 optional Action 4 Way Actuation Solenoid Action only Main valve actio...

Страница 8: ...the valve opens or closes The adjustable collar is normally set to contact the trip arm when the main valve is closed The collar can be positioned on the stem by loosening the set screw to actuate the...

Страница 9: ...n In the free flow direction the seat moves out of the flow path to all unrestricted flow Specifications Standard Flow Control Large Flow Control FLOW FLOW CLOSED Fluid Speed Controlled by Needle FLOW...

Страница 10: ...ilot circuit speed controls and pilots The filter element can be accessed for cleaning by removing the clean out cap or may be cleaned by installing an optional blow down ball valve The wetted surface...

Страница 11: ...re used in pilot lines to provide a positive shutoff in any override or maintenance situation for simple trouble shooting This 2 piece full port valve features bottom loaded stems PTFE seats and packi...

Страница 12: ...switches at the desired point of valve travel Body Material Stainless Steel Elastomers Buna N standard EPDM optional Viton optional Enclosure NEMA 1 3 4 and 13 General Purpose standard NEMA 1 7 and 9...

Страница 13: ...made during installation to protect the piping circuit from dam age Only remove the pilot control system from the valve if necessary Tubing and fittings should be kept clean and replaced exactly as re...

Страница 14: ...of movement and remove excess air trapped within the cover chambers See Figure 1 Below To increase the rate of opening closing turn the adjustment screws on the speed controls OUT counterclockwise In...

Страница 15: ...e flow goes into the lower chamber the Opening speed flow control restricts flow out of the upper cham ber of the main valve If valve opening is too slow turn the adjustment screw OUT counterclockwise...

Страница 16: ...valve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace di...

Страница 17: ...ation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blo...

Страница 18: ...em Nut examine stem threads for mineral build up Remove deposits with a fine wire brush Extreme care should be taken not to damage the finish on stem guiding surfaces when disassembling Avoid applying...

Страница 19: ...s not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances ove...

Отзывы: