Setting the Altitude Controls

STEP 1

Pre-set pilots as noted:

Altitude Control 

– Adjust OUT, counterclockwise, backing pressure off the spring. This simulates a low tank setting which can be 

gradually increased to the desired setting.

Opening and Closing Speed

 – Turn the adjustment screws on the Closing Speed and Opening Speed Controls, if the main valve is so 

equipped, OUT, counterclockwise, 11/2 to 21/2 turns from full closed position.

STEP 2

To ensure proper operation, any trapped air will need to be bled 
off the valve cover during startup. The ACV includes a bleed valve, 
use a flat head screwdriver to slowly open the valve (See Figure 1).

STEP 3

Pressure the line, by opening the upstream isolation valve slowly. 
Air is vented through the air bleed valve. Tighten the fitting when 
liquid begins to vent (See Figure 1).

Repeat the process until no air is trapped in the system.

Globe

Angle

Size (in)

1

 

1/4

1

 

1/2

2

21/2

3

4

6

8

10

12

14

16

20

24

A (in)

16

16

20

22

22

24

32

34

38

44

48

52

56

56

B (in)

10

10

12

14

14

16

24

26

28

30

34

40

48

48

Size (in)

1

 

1/4

1

 

1/2

2

2

 

1/2

3

4

6

8

10

12

14

16

C (in)

16

16

20

22

22

24

32

34

38

44

48

52

D (in)

10

10

12

14

14

16

24

26

28

30

34

40

The following tables detail the recommended minimum valve servicing dimensions.

          

B

          

          

FLOW

FLOW

FLOW

          

FLOW

Valve Servicing Dimensions

Counterclockwise to OPEN 

bleed valve

Figure 1 

Position Indicator

IOM-A-ACV-960-17_660-17   2115 

EDP# 1917058 

© 2021 Watts         3

Содержание AMES 960GD-17

Страница 1: ...tude Controls 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the information provide...

Страница 2: ...2 1 Accelerator Control 3 Altitude Control 4 Check Valve 5 Adjustable Opening Speed 6 Adjustable Closing Speed 7 3 Way Ball Valve P Position Indicator X Isolation Cocks 1 Prior to installation flush l...

Страница 3: ...wly open the valve See Figure 1 STEP 3 Pressure the line by opening the upstream isolation valve slowly Air is vented through the air bleed valve Tighten the fitting when liquid begins to vent See Fig...

Страница 4: ...he downstream isolation valve STEP 5 If the valve remains closed as indicated by the stem position in the position indicator See Figure 2 and the tank level is known to be below the desired level SLOW...

Страница 5: ...ates fluid pressure into the main valve cover chamber controlling the valve closing speed If the downstream pressure fluctuates slightly above the desired setpoint turn the adjustment screw OUT counte...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...2 turns open from full closed position Can be adjusted in field Main Valve will not close Closed isolation valves in pilot system Check isolation valves ensure open Diaphragm is damaged Conduct diaph...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: