STEP 4 

Open downstream isolation valve to establish flow through the 
system.

STEP 5

Setting the Sustaining Control requires lowering the upstream 
pressure to the desired minimum sustained pressure.

STEP 6

Leave the downstream isolation valve full open and close the up-
stream isolation valve until the inlet pressure drops to the desired 
setting.

STEP 7

Adjust the Sustaining Control screw IN, clockwise, until the inlet 
pressure begins to increase, or OUT, counterclockwise, to de-
crease, stopping at the desired pressure (See Figure 2).

4          IOM-A-ACV-920-01_620-01   2115 

EDP# 1917052 

© 2021 Watts

IOM-A-ACV-920-01_620-01   2115 

EDP# 1917052 

© 2021 Watts         5

Figure 2 

PV20C — Pressure Sustaining Control

Clockwise to increase inlet 

pressure

Counterclockwise to decrease 

inlet pressure

Содержание Ames 620GD

Страница 1: ...2 Setting the Pressure Controls 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the...

Страница 2: ...ude the optional opening speed control when used for Backpressure applications When the Model valve is located in line connecting two distribution zones the valve acts as a Pressure Sustaining Control...

Страница 3: ...o 21 2 turns from full closed position STEP 2 To ensure proper operation any trapped air will need to be bled off the valve cover during startup If your ACV includes a bleed valve use a flat head scre...

Страница 4: ...d close the up stream isolation valve until the inlet pressure drops to the desired setting STEP 7 Adjust the Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT c...

Страница 5: ...g IF INSTALLED Opening Speed Flow Control Adjustment The Opening speed flow control allows free flow into the cover and re stricted flow out of the cover of the main valve If recovery of pres sure is...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...ly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for o...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: