Modulex EXT Commercial Series Boilers User Manual
CHAPTER 4: Installation Instructions
OMM-0095_0H
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
75
of
144
GF-139
Phone: 800-526-0288
09/15/2017
4.39 INITIAL BOILER IGNITION
4.39.1 Preliminary Checks
CAUTION!
To ensure the continued safe operation of the boiler it is highly recommended that it is
checked at regular intervals and serviced when necessary, and that only original spare parts
are used. Regular attention will prolong the life of the boiler.
Before igniting the boiler, check that:
•
The boiler installation has been carried out in accordance with the specific standards as
instructed in this manual.
•
The combustion air inlet and the discharge of combustion exhaust occur in the correct
manner in accordance to the specific standards in force.
•
The gas supply system is correctly configured for the boiler’s output.
•
The boiler’s electrical supply is 120 V - 60 Hz.
•
The system has been filled with water (pressure registered on the gauge 0.8/1 bar with
pump not running).
•
All of the system’s on/off valves are in the appropriate position (open or closed as required)
•
The mains gas supply corresponds to the one which the boiler has been calibrated for.
Otherwise convert the boiler to use the available gas (refer to section: “GAS
CONVERSION”). This operation must be carried out by a qualified technician in compliance
with the regulations in force.
•
The gas supply valve is open.
•
There are no gas leaks.
•
There are no water leaks.
•
The external mains electrical supply switch is on.
•
The boiler system’s safety valve is not blocked and is connected to the waste water system.
•
The condensate drain line has been filled with water and that it is connected to the waste
water system. (For more information, see section 4.14.)
WARNING!
Before firing up the appliance, be sure to fill up the condensate drain line (see section
4.14) through the filling hole and check the correct drainage of the condensate.
Using the boiler with the condensate drain siphon empty could cause a dangerous
condition due to poisonous emissions from the flue exhaust gasses.
•
All the necessary ventilation conditions and minimum clearance distances are in place for
subsequent servicing in case the boiler is sited in a cupboard compartment.
•
There are no water leaks.