Benchmark Platinum-Edge [ii]: Operation-Service Manual
SECTION 8
– MAINTENANCE
OMM-0137_J
• 12/20/2022 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
111
of
167
Benchmark 5000 & 6000
Long Term Blower Storage Instructions
storing it in a damp or humid location will, very quickly, cause internal corrosion and
motor failure which is not warranted.
NOTE:
For specific storage instructions, for the actual motor and any accessory
parts that were supplied, refer to the
manufacturer’s instructions.
Figure 8-11: Benchmark 6000 Blower Exploded View
8.11 RETURNING THE BOILER TO SERVICE AFTER SHUTDOWN
After a prolonged shutdown (one year or more), the following procedures must be followed:
Placing the Boiler Back In Service After A Prolonged Shutdown Instructions
1. Review installation requirements included in Section 2 of the
Benchmark Platinum-Edge:
INSTALLATION Manual
(GF-210).
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent and air inlet duct work (if applicable).
4. Perform initial startup per Section 4 of this guide.
5. Perform the instructions in Section 5:
Safety Device Testing
, above, and all scheduled
procedures described Section 8:
Maintenance
.
1. INLET FLANGE
2. INLET-SIDE PLATE
3. INLET-SIDE HOUSING
4. BLOWER WHEEL
5. DRIVE-SIDE HOUSING
6. DRIVE-SIDE PLATE
7. BASE, FAN
8. MOTOR
9. RISER BLOCKS *
10. RISER BASE *
* IF REQUIRED